Town CrierWest Orange, New Jersey
← Back to search

Packet · May 6, 2025

Township Council Meeting — Packet

Preserved file SHA-25687663901327ebaaaf6246e00d7581d4eca5deb3609fc0fb6923601f64c174685

Indexed text · page 83

Show all pages
Page 83

2 August 2024 Lenin S. Cruz, P.E. Project Engineer Greenman-Pedersen, Inc. 301 Gibraltar Drive, Suite 2A Morris Plains, NJ 07950 Proposal for Preliminary Engineering (P.E.) Professional Land Surveying Services NJDOT TAP 2023 – West Orange, Washington Street Corridor Improvement Project Phase 2 Located in the Township of West Orange, Essex County, New Jersey (MFS Proposal No. NJ24060.001R1) Dear Lenin, MFS Consulting Engineers & Surveyor, DPC (MFS) is pleased to submit this proposal to provide professional land surveying services to support the Preliminary Engineering (PE) Phase for the TAP 2023 West Orange Washington St. project. The following proposal briefly discusses our project understanding and scope of work. PROJECT UNDERSTANDING To support the TAP 2023 West Orange Washington St., MFS shall perform the following NJDOT PE Activities. 1. Activity 3015 – Prepare Control Survey Report 2. Activity 3020 – Conduct Topographic Survey 3. Activity 3025 – Prepare Base Maps The services shall include: • • • • • • • • Survey limits to extend 10’ (ft) beyond the Right of Way (ROW). Survey to include building faces, steps and building finished floor elevations at doorway thresholds. Key ground surface features (i.e., top/bottom curb lines, crown of road, ADA ramps, top/bottom utility pads) and other breakline features in addition to random spot elevations. All visible and accessible surface features (i.e., walks, pads, surface utilities, fences, etc.). Any existing sub-surface utility mark-out found within the mapping limits. Establish rim/grate/invert elevations on sanitary and drainage structures within the project corridor. Electrical & telephone manholes or vaults to be located on the surface only. Locate any Right of Way (ROW) and/or boundary evidence found while performing the survey. Establish ROW deed mosaic. Include properties fronting the streets within the project limits, including sidelines and lot lines off the right of way to be shown on a deed mosaic.

File revisions (1)