Packet · Jun 24, 2025
Township Council Meeting — Packet
e8a4f3fff12fc468ad60b087caf2550944b09e9413c443ef4ac8c9c0b2aff448Indexed text · page 161
Show all pagesWork item details: Local Public Agency: TOWNSHIP OF WEST ORANGE, NJ Project Location: XXX Section XXX From XXX to XXX (XXX) Federal Project Number: XXX Project Phases Included: Project Description: Construction Engineering/Inspection Sek He ***Edit the Following as needed*** The TOWNSHIP OF WEST ORANGE's proposed work 6. will begin XXX of XXX (Station XXX) and the XXX terminus of the project is XXX of XXX (Station XXX). The proposed highway improvement work will be in-kind within the existing right-of-way, and will consist of: The roadway will be milled and resurfaced within the project limits and width of roadway pavement. (The existing concrete curb limits will be maintained throughout.) The roadway centerline will be reprofiled to provide for an appropriate cross slope and centerline grade. Traffic signage will be replaced and added throughout the entire length of the project, as applicable. Traffic striping and markings will be placed on the new roadway pavement, as appropriate. Raised pavement markers will also be installed. Drainage structures throughout the project will be upgraded, reconstructed or replaced, as applicable. If needed, in kind replacement of existing curb. Estimated Construction Amount: $ XXX Funding: Federal Funding involved forl 00% Construction and Civil Engineering/Inspection Term of Contract: DBE goal: eR HCA ok Foe Until project completion XX.X% Required NJDOT Cost Basis Approval: Construction Engineering and Inspection RFP Requirements Page 6
File revisions (1)
- Sep 29, 2026
e8a4f3fff12f48,886,751 bytes