Packet · Jul 22, 2025
Township Council Meeting — Packet
318b435c5d21c38be1dad0002267862f26b8c990a5f5aff8a1a1b660d28343f5Indexed text · page 273
Show all pagesShauger Property Services, Inc. Property Construction Billing Report DATE: 6/10/2025 DAY: Tuesday CLIENT: TOWNSHIP OF WEST ORANGE c/O: DEPARTMENT OF DPW CONTACT: ZAYIBETH CARBALLO BILLING ADDRESS: 25 LAKESIDE AVENUE WEST ORANGE, NJ 07052 PROJECT NAME: ESSEX GREEN LOCATION: 12 ROONEY CIRCLE, WEST ORANGE, NJ JOB NO.: PC25-033 Email: zcarballo@westorange.org WORK COMPLETED: 7/1/2025 Phone: 973-325-4165 Email: SCOPE OF WORK $ 442,710.63 RE: Emergency Response, Excavation, Repair, and Replacement Activities — Rooney Circle Stormwater Infrastructure Failure Location: Rooney Circle, West Orange, NJ Contractor: The Shauger Property Services, Inc. In response to a major stormwater infrastructure failure at Rooney Circle in West Orange, NJ, The Shauger Property Services, Inc. mobilized to perform emergency excavation, repair, and replacement operations. The scope of work included deep trench excavation with timber shoring for trench protection, installation of high-density polyethylene (HDPE) storm piping, concrete reinforcement, and final paving to restore full stormwater system functionality. Confined Space Setup & Inspection Established a Confined Space Entry (CSE) protocol for safe access to a 26-foot-deep storm manhole. Performed manned entry into the manhole to conduct an internal inspection. Utilized a portable push camera system to inspect the storm line and confirm the location and extent of the pipe collapse. Captured and submitted photographic evidence of the damaged pipe to the client for documentation and repair planning. :
File revisions (1)
- Sep 29, 2026
318b435c5d2139,153,095 bytes