Town CrierWest Orange, New Jersey
← Back to search

Packet · Oct 16, 2025

Township Council Meeting - Thursday — Packet

Preserved file SHA-256e96d967f11797e857c9cc43658c6b321d1be767acce3bec619a6522d21eeae67

Indexed text · page 90

Show all pages
Page 90

PARKS AND RECREATION CME Associates has significant experience in the design and construction of a wide array of parks and recreational facilities, and has received numerous awards in recognition thereof. The Parks and Recreation Group performs feasibility studies, conceptual planning, and preliminary and final designs; prepares drawings, bid documents, and permit applications; and also performs construction administration and field observation services. The following list highlights the types of projects carried out by the Parks and Recreation Group: Park and Recreation Facilities Design Recreation Master Plans Athletic Field Rehabilitation Synthetic Turf Fields Recreation Facilities and Inclusive Playgrounds Pedestrian Walkways / Bikepaths Athletic Field Lighting Track & Field Facilities Design Recreation Feasibility Studies ADA Facilities Design Waterfront Park Design Skating Rinks Municipal Park Rehabilitation Site Planning Irrigation Systems Skate Parks Trails

File revisions (1)