Town CrierWest Orange, New Jersey
← Back to search

Packet · Apr 28, 2026

Township Council Meeting — Packet

Preserved file SHA-25606df1f76951def1c065c048330083bddbf54ecfa8c126d71d405205e5febb42f

Indexed text · page 105

Show all pages
Page 105

FIXED FEE CALCULATION PROJECT: SRTS West Orange – Gregory Ave. & Lowell Ave CONSULTANT: AmerCom Corp. AGREEMENT OR CAM NO. PREPARED BY: DATE: Mark Sheptock 8/21/2025 EVALUATE PROJECT SPECIFICS: Directions: Prime Consultant will use Total Project Design Cost (or Task Order Design Cost) for the SIZE criteria Each Subconsultant will assign points for SIZE, COMPLEXITY, DURATION, & DEGREE OF RISK based on its specific project tasks. SPECIFICS CRITERIA SIZE: COMPLEXITY: DURATION: DEGREE OF RISK: POINTS RATING SMALL - Total Fee (Project Design Cost) < $1,250,000 15 15 LARGE - Total Fee (Project Design Cost) > $1,250,000 20 SIMPLE - Limited Scope of Work; Deck Patching, Resurfacing, Restoration, Inspection, Concept Development Services 10 STANDARD - Moderate Scope; Rehabilitation, New, or Reconstruction 15 COMPLEX - Multi-disciplined, Highly Specialized, or Major Unusual 20 STANDARD - Appropriate Schedule 15 AGGRESSIVE - Designers Schedule Reduced > 10 % 20 LEVEL 1 - Low Risk of Claims; Studies, Surveys, Landscape, Inspections 20 LEVEL 2 - Average Risk of Claims; Standard Complexity or Level 1 with High Public Exposure 30 LEVEL 3 - High Risk of Claims; Hazardous, Experimental, or Bonus/Penalty Clauses 40 10 15 20 TOTAL RATING = CALCULATE FEE: PROJECT SPECIFICS FACTOR (Total Rating /100) = 0.60 FEE FACTOR ( Project Specifics Factor x 0.30) = 0.18 DIRECT LABOR COSTS $ 20,099.18 TOTAL FEE (Direct Labor Costs x Fee Factor) = $ 3,618 VERIFY THAT FEE FALLS WITHIN RANGE OF 6% TO 15%: CONSULTANT'S INTERIM OVERHEAD RATE ( % ) = OVERHEAD (Labor x Overhead Rate) = FIXED FEE RANGE [ Fee/(Labor + Overhead)] = 198.49% $ 39,894.86 6.0% 60

File revisions (1)