Town CrierWest Orange, New Jersey
← Back to search

Packet · Apr 28, 2026

Township Council Meeting — Packet

Preserved file SHA-25606df1f76951def1c065c048330083bddbf54ecfa8c126d71d405205e5febb42f

Indexed text · page 92

Show all pages
Page 92

SUBTOTAL SUBTOTAL 1 a b c SURVEY GEOMETRICS AND ROADWAY Prepare Horizontal and Vertical Geometry Prepare Preliminary Roadway Plans Roadway Plans Utility Agreement Plans SUBTOTAL 3030 3070 2 a b TRAFFIC 3090 3 a 3085 4 a 5 Conduct Boundary and Topographic Survey Prepare Survey Control Report Prepare Base Maps HRS. HRS. HRS. Hours Cost 36 24 52 8 242 40 4 4 8 8 4 8 8 16 4 4 4 40 4 4 8 8 4 4 HRS. HRS. HRS. 26 8 96 32 2 2 2 2 8 2 3020 3015 3025 TOTAL TASK DESCRIPTION PRELIMINARY ENGINEERING PROJECT MANAGEMENT & CONTROLS 1 Project Management (Assume 4 hrs/month) 3874 2 Execute Public Involvement Action Plan Coordination Meetings 2a Stakeholder Meetings 2b 3865 2c Hold Public Information Center In-Person PIC Plan Displays/Presentation Prepare Project Website 3 Quality Assurance & Quality Control 3005 4 Initiate Preliminary Engineering TOTAL PRJ. MNGR. (P-VII). SEN. ENGR. (P-V) PROJ. ENGR. (P-IV) ENGINEE R (P-III) ASSOC. ENGR. (P-I) SEN. PLAN. (P-IV) PLANNE R (P-II) SEN. DRAFT. (ET-V) ACTIVITY I.D. Safe Routes to School West Orange Township 12 4 4 4 HRS. HRS. 18 20 46 48 6 $ $ $ $ $ $ $ $ $ $ $ 18,522.86 3,543.76 1,860.62 2,631.30 1,381.94 1,290.88 3,027.46 4,258.16 528.74 8 8 36 20 4 12 $ $ $ $ 2,294.00 1,154.64 357.20 782.16 23,279.50 7,231.06 10,368.80 5,679.64 26 38 8 8 16 8 24 8 40 8 82 30 140 48 140 40 402 126 24 8 32 20 60 32 60 40 176 100 $ $ $ $ $ SUBTOTAL 8 8 16 16 24 24 24 24 72 72 $ $ 4,229.12 4,229.12 DRAINAGE/ H&H/ SWM Prepare Preliminary Drainage Design SUBTOTAL 4 4 12 12 20 20 36 36 $ $ 2,261.40 2,261.40 STRUCTURES SUBTOTAL 8 20 40 68 $ 4,242.20 Determine Traffic Engineering Facility Locations

File revisions (1)