Packet · Apr 28, 2026
Township Council Meeting — Packet
06df1f76951def1c065c048330083bddbf54ecfa8c126d71d405205e5febb42fIndexed text · page 98
Show all pagesFIXED FEE CALCULATION PROJECT: Safe Routes to School CONSULTANT: STV, Inc. AGREEMENT OR CAM NO. PREPARED BY: Kenneth Burkhardt DATE: 8/19/2025 EVALUATE PROJECT SPECIFICS: Directions: Prime Consultant will use Total Project Design Cost (or Task Order Design Cost) for the SIZE criteria Each Subconsultant will assign points for SIZE, COMPLEXITY, DURATION, & DEGREE OF RISK based on its specific project tasks. SPECIFICS CRITERIA POINTS SIZE: COMPLEXITY: DURATION: DEGREE OF RISK: SMALL - Total Fee (Project Design Cost) < $1,250,000 15 LARGE - Total Fee (Project Design Cost) > $1,250,000 20 SIMPLE - Limited Scope of Work; Deck Patching, Resurfacing, Restoration, Inspection, Concept Development Services 10 STANDARD - Moderate Scope; Rehabilitation, New, or Reconstruction 15 COMPLEX - Multi-disciplined, Highly Specialized, or Major Unusual 20 STANDARD - Appropriate Schedule 15 AGGRESSIVE - Designers Schedule Reduced > 10 % 20 LEVEL 1 - Low Risk of Claims; Studies, Surveys, Patching, Resurfacing, Restoration, Concept Development, Studies, Surveys, Landscape, Inspections 20 LEVEL 2 - Average Risk of Claims; Standard Complexity or Level 1 with High Public Exposure 30 LEVEL 3 - High Risk of Claims; Hazardous, Experimental, or Bonus/Penalty Clauses 40 TOTAL RATING = RATING 15 15 15 20 65 CALCULATE FEE: PROJECT SPECIFICS FACTOR (Total Rating /100) = 0.65 FEE FACTOR ( Project Specifics Factor x 0.30) = 0.195 DIRECT LABOR COSTS $211,888 TOTAL FEE (Direct Labor Costs x Fee Factor) = $ 41,318
File revisions (1)
- Sep 29, 2026
06df1f76951d9,023,608 bytes