work, submit to the RE for approval a marking plan that includes: 1. Schedule of operations for applying traffic markings. 2. Number and type of equipment. 3. Manufacturer’s recommendations for use of the materials, including mixing ratios and application temperatures. 4. Details on the means and methods for surface preparation. 5. Details on the means and methods for premarking. B. Surface Preparation. Immediately before marking the pavement surface, clean the surface of dirt, oil, grease, and foreign material, including curing compound on new concrete. Clean the surface 2 inches beyond the perimeter of the marking to be placed. HELEN AVE., LAWRENCE AVE., FLORENCE PL., AND LOWELL AVE., IMPROVEMENTS PROJECT Page 60 of 76

Page 886

C. Applying Traffic Markings. Place preformed thermoplastic or hot extruded thermoplastic traffic markings on thoroughly dry surfaces and during dry weather conditions. Apply using equipment and procedures that produce markings of the specified color, width, and thickness with well-defined edges, uniform retroreflectivity, and proper bonding to the pavement. Apply the thermoplastic material as follows: 1. Preformed Thermoplastic. Melt the preformed thermoplastic tape to bond the traffic markings permanently in position according to the manufacturer’s recommendations. Meet the minimum initial retroreflectance value, as specified in 610.03.01.D for thermoplastic tape, by applying additional glass beads to the hot-wet material in a uniform pattern as necessary. 2. Extruded Thermoplastic. Uniformly heat the thermoplastic material. When the ambient and surface temperatures are at least 50 °F, apply the melted material at a temperature of between 400 and 425 °F. Extrude the thermoplastic traffic markings on the HMA or concrete pavement ensuring a thickness of 90  1 mils. Immediately after, or in conjunction with the thermoplastic extrusion, uniformly apply glass beads to the wet material at a minimum rate of 10 pounds per 100 square feet of markings. Apply glass beads by mechanical means only. D. Applying Transverse Rumble Markings. Install transverse rumble markings as follows: 1. Ensure the HMA or concrete pavement is clean and dry before applying thermoplastic materials as specified in 610.03.02.B. 2. Heat thermoplastic material as specified in 610.03.02.C.2. 3. Apply one layer of thermoplastic material on the HMA or concrete pavement surface at a thickness of 125 ± 1 mils. Then while the material is hot, apply a second layer of thermoplastic material at 125 ± 1 mils. 4. Uniformly apply glass beads as specified in 610.03.02.C.2. 5. The Contractor will ensure that there is no separation between the first and second layer of thermoplastic material before the RE’s final acceptance of transverse rumble markings. 6. The Contractor will ensure that the appropriate thickness of 125 ± 1 mils per layer of thermoplastic material is installed, any markings found by the RE to be

Page 886

erse rumble markings. 6. The Contractor will ensure that the appropriate thickness of 125 ± 1 mils per layer of thermoplastic material is installed, any markings found by the RE to be thinner than 125 ± 1 mils will be removed and reinstalled by the Contractor at no additional cost to the Department. 7. The Department will make payment for transverse rumble markings by square feet under TRAFFIC MARKINGS SYMBOLS as specified in 610.04. 8. Thermoplastic material for transverse rumble markings shall be white in color. E. Performance. Ensure that the traffic markings show no fading, lifting, cracking, chipping for any reason including but not limited to traffic wear, maintenance activities including snow plowing, until Acceptance. Ensure that 60 days after application, traffic markings have a minimum retroreflectance value of: 375 millicandelas per square meter per lux for white traffic markings 250 millicandelas per square meter per lux for yellow traffic markings F. Defective work. Replace thermoplastic traffic markings that are determined by the RE before Acceptance to be defective or that are damaged during construction. Remove defective markings as specified in 610.03.08. Replace the entire area of thermoplastic traffic markings determined to be less than the required thickness, to have incorrect color or width, to have failed to bond to the pavement, or to have chipped or cracked. The minimum replacement area is an individual word or symbol, or for longitudinal lines the entire length from where the deficiency first occurs to where it no longer exists. The RE will determine initial retroreflectance as follows: Provide the RE with a Reflectometer that meets a 30 meter geometry as specified in ASTM E 1710, capable of measuring wet and dry conditions as specified in ASTM E 2176 and ASTM E 2177, and that has been certified by the manufacturer as being calibrated within the last 2 years. The RE will test the retroreflectance of traffic markings with the provided reflectometer according to the manufacturer’s recommendations. Replace traffic markings that do not meet the retroreflectance values indicated in 610.03.02.E. G. Opening to Traffic. Complete each application of thermoplastic traffic markings and allow to thoroughly dry

Page 886

ic markings that do not meet the retroreflectance values indicated in 610.03.02.E. G. Opening to Traffic. Complete each application of thermoplastic traffic markings and allow to thoroughly dry before opening to traffic. The RE will determine when the traveled way can be opened to traffic. HELEN AVE., LAWRENCE AVE., FLORENCE PL., AND LOWELL AVE., IMPROVEMENTS PROJECT Page 61 of 76

Page 887

610.03.03 RPMs (Raised Pavement Markers) THE FOLLOWING IS ADDED AFTER THE LAST PARAGRAPH: Ensure that RPMs are installed within 14 days of opening each day’s surface paving to traffic. 610.04 MEASUREMENT AND PAYMENT THE SUBPART IS CHANGED TO: The Department will measure and make payment for Items as follows: Item Pay Unit TRAFFIC MARKING LINES, 4" LINEAR FOOT TRAFFIC MARKING LINES, 6” (IF & WHERE DIRECTED) LINEAR FOOT TRAFFIC MARKING LINES, 8” LINEAR FOOT TRAFFIC MARKING LINES, 12” (IF & WHERE DIRECTED) LINEAR FOOT TRAFFIC MARKING LINES, 24” LINEAR FOOT TRAFFIC MARKING SYMBOLS (IF & WHERE DIRECTED) SQUARE FOOT The Department will measure TRAFFIC MARKING LINES by the linear foot for each specified width of stripe. The Department will not measure gaps in striping. SECTION 612 – SIGNS 612.02 MATERIALS THE FOLLOWING MATERIAL IS CHANGED TO: Steel “U” and Square Tube Post Sign Supports ............................................................................................. 911.02.01 612.03 CONSTRUCTION 612.03.01 Regulatory and Warning Signs, and Guide Sign, Type GA Steel “U” Post Supports THE SUBPART IS RENAMED TO: 612.03.01 Regulatory and Warning Signs, and Guide Sign, Type GA Steel “U” and Square Tube Post Supports THE SECOND PARAGRAPH IS CHANGED TO: Mount sign panels on breakaway steel “U” or square tube post sign supports. For signs located behind guide rails or other roadside barriers, mount sign panels on steel “U” or square tube post sign supports without the breakaway assembly. 612.04 MEASUREMENT AND PAYMENT THE FOLLOWING ITEM IS CHANGED TO: Item

Page 887

ost sign supports without the breakaway assembly. 612.04 MEASUREMENT AND PAYMENT THE FOLLOWING ITEM IS CHANGED TO: Item Pay Unit REGULATORY AND WARNING SIGN SQUARE FOOT GUIDE SIGN, TYPE GA, STEEL “U” AND SQUARE TUBE POST SUPPORTS SQUARE FOOT DIVISION 650 – UTILITIES HELEN AVE., LAWRENCE AVE., FLORENCE PL., AND LOWELL AVE., IMPROVEMENTS PROJECT Page 62 of 76

Page 888

SECTION 651 – WATER 651.01 DESCRIPTION THE FOLLOWING IS ADDED: The Work described in this Section is for work performed when the utility is owned by a municipality. The Contractor shall coordinate all work with the local utility authority. The utility owner is responsible for all inspection and testing. 651.04 MEASUREMENT AND PAYMENT THE FOLLOWING IS CHANGED TO: Separate payment shall not be made for Water Valve Box Reset. Shall be included under Hot Mix Asphalt 12.5M64 Surface Course. SECTION 652 – SANITARY SEWERS 652.01 DESCRIPTION THE FOLLOWING IS ADDED: The Work described in this Section is for work performed when the utility is owned by a municipality. The Contractor shall coordinate all work with the local utility authority. The utility owner is responsible for all inspection and testing. 652.03.04 Sanitary Sewer Service Connections THE FOLLOWING IS ADDED: A. SANITARY SEWER SERVICE CONNECTIONS Performed by the Contractor House connections damaged by the Contractor shall be restored to proper operating conditions at no cost to the Township. The size and type of pipe and type of joint shall conform to the requirements of the corporations, companies, agencies, or municipalities owning or controlling the utility. When the service connection lines needs to be relocated due to a field conflict, the length of line replaced will be paid by the linear foot and will include all Work to restore the service. Plastic or PVC pipe and fittings may be used if permitted by corporations, companies, agencies, or municipalities owning or controlling the utility. 652.04 MEASUREMENT AND PAYMENT THE FOLLOWING ITEMS ARE ADDED: Pay Item Pay Unit RECONSTRUCTED MANHOLE, SANITARY SEWER, USING EXISTING CASTING UNIT RECONSTRUCTED MANHOLE, SANITARY SEWER, USING NEW CASTING UNIT THE FOLLOWING IS ADDED: Payment for Setting Castings on Sanitary Manholes, Resetting Sanitary Manhole Castings, and Rebuilding Sanitary Manholes & Reconstructing Manholes shall be made under the respective bid items in section 602. SECTION 653 – GAS 653.01

Page 888

astings, and Rebuilding Sanitary Manholes & Reconstructing Manholes shall be made under the respective bid items in section 602. SECTION 653 – GAS 653.01 DESCRIPTION THE FOLLOWING IS ADDED: The Contractor shall coordinate all work with the local utility authority. The utility company is responsible for all inspection and testing. HELEN AVE., LAWRENCE AVE., FLORENCE PL., AND LOWELL AVE., IMPROVEMENTS PROJECT Page 63 of 76

Page 889

653.04 MEASUREMENT AND PAYMENT THE FOLLOWING IS CHANGED TO: Separate payment shall not be made for Reset Gas Valve Box. Shall be included under Hot Mix Asphalt 12.5M64 Surface Course. HELEN AVE., LAWRENCE AVE., FLORENCE PL., AND LOWELL AVE., IMPROVEMENTS PROJECT Page 64 of 76

Page 890

DIVISION 800 – LANDSCAPING SECTION 802 – TRIMMING AND REMOVING TREES 802.04 MEASUREMENT AND PAYMENT THE FOLLOWING IS ADDED TO THE FIRST PARAGRAPH: Any necessary TREE REMOVAL less than 6” in diameter removal shall be included in Item CLEARING SITE. No additional payment will be made for tree trimming under the direction of the Township. THE FOLLOWING HAS BEEN ADDED: Pay Item Pay Unit STUMP REMOVAL (IF AND WHERE DIRECTED) UNIT TREE REMOVAL, OVER 6” TO 12” DIAMETER (IF & WHERE DIRECTED) UNIT TREE REMOVAL, OVER 12” TO 18” DIAMETER UNIT TREE REMOVAL, OVER 18” TO 24” DIAMETER (IF & WHERE DIRECTED) UNIT TREE REMOVAL, OVER 24” TO 30” DIAMETER (IF & WHERE DIRECTED) UNIT TREE REMOVAL, OVER 30” TO 36” DIAMETER (IF & WHERE DIRECTED) UNIT TREE REMOVAL, OVER 36” DIAMETER (IF & WHERE DIRECTED) UNIT SECTION 806 – FERTILIZING AND SEEDING 806.03.01 TURF SEEDING C. Seed and Fertilizer Application 2. Dry Method. ADD THE FOLLOWING Newly seeded areas need to be kept moist. Without regular rainfall, water ¼” twice a day until vegetation is well established. E. Turf Establishment. ADD THE FOLLOWING During dry seasons, water planting areas with ½” of water every 3-4 days. 806.04 MEASUREMENT AND PAYMENT THE FOLLOWING IS CHANGED TO: Separate payment shall not be made for FERTILIZING AND SEEDING, TYPE A-3. Payment for FERTILIZING AND SEEDING, TYPE A-3 shall be included under the various bid items in sections 606 and 607. HELEN AVE., LAWRENCE AVE., FLORENCE PL., AND LOWELL AVE., IMPROVEMENTS PROJECT Page 65 of 76