SECTION 809 – MULCHING 804.04 MEASUREMENT AND PAYMENT THE FOLLOWING IS CHANGED TO: Separate payment shall not be made for STRAW MULCHING. Payment for STRAW MULCHING shall be included under the various bid items in sections 606 and 607. SECTION 811 – PLANTING 811.01 DESCRIPTION ADD THE FOLLOWING: The contractor shall provide a list of available trees equivalent in price to the species indicated under the materials to the Township Engineer and Forrester. The Engineer and Forrester shall then select the species and quantity of trees to be planted and indicate the location of the plantings. The Contractor is to coordinate field verified planting locations with Township Forrester. 811.02 MATERIALS ADD THE FOLLOWING: Plants: Shall be one of the following species or an approved equal available species to following trees: Ornamentals to be planted when there are overhead utility lines involved 1. Okame Cherry 2. Kwanzan Cherry 3. Autumn flowering Cherry 4. Redbud 5. Centzan Flowering Crabapple 6. Ivory Silk Japanese Lilac 7. Winter king Hawthorn 8. Pyramidal European Hornbeam Shade trees to be planted when there is growing space adequate and no utility lines 1. Jefferson Elm 2. Swamp White Oak 3. Eastern Hackberry 4. Black Gum 5. Magar Gingko 6. Trident maple 7. Hedge Maple 8. Dawn Redwood 9. Fruitless Sweetgum All trees shall be 1 ½”-2 ½”” caliper. The location of the trees will be at the direction of the Engineer and/or Forester. All planting to be done whenever the weather and soil conditions are favorable or as otherwise authorized by the Owner or his representative. All plant material shall conform to the American Standard for Nursery Stock, as published by the American Association of Nurserymen, 1250 I Street, N.W., Suite 500, Washington, D.C. 20005. All plants must be disease, fungi, and insect free upon delivery. All materials must be watered down and covered with a heavy tarpaulin while in transit. Upon arrival the tarp shall be lifted off the plant material. On-site storage of plant material shall be in accordance with the following: HELEN AVE., LAWRENCE AVE., FLORENCE PL., AND LOWELL AVE., IMPROVEMENTS PROJECT Page 66 of 76
1.) Roots and balls shall at all times be protected from the sun or from drying winds. 2.) Plants that are not immediately planted upon delivery shall be set on the ground and well protected with soil, wet moss, or other applicable material as approved by the Engineer. Soil: Topsoil furnished shall contain no stones, lumps, roots, or similar objects larger than one inch in any dimension and shall have a pH value not less than 5.5 and not more than 7.5. If the pH value of the topsoil is less than 5.5, it shall be increased by applying ground limestone at the rate necessary to attain a pH value in the range required. Topsoil shall have a minimum organic content of not less than 3.75 percent by weight. When the organic content of the topsoil furnished is less than 3.75 percent, it shall be increased by adding peat at the rate necessary to attain this minimum organic content range required. Diameter and Depth of Size of Trees Planting Holes 2-1/2 to 3 inch caliper 40 inches by 26 inches Should the ball be larger than specified, the excavation must have a twelve inch clearance around the entire ball. The depth of the hole should be deep enough to allow for a good six inches of drainage after being backfilled and firmed. All planting material to be supplied by nurseries in the Mid-Atlantic region of the United States. Amended soil shall be 80% topsoil in accordance with 917.01, 20% organic material such as leaf mold or peat moss. In addition, incorporate a 10-10-10 fertilizer and an endo and ectomycorrhizal fungi transplant amendment; both applied per the manufacturer’s recommendation. Each tree planted shall receive a 20 gallon “TreeGator” drip bag watering system or approved equal. “TreeGator” may be obtained from Spectrum Products, Inc., 4200 Atlantic Ave., Suite 152, Raleigh, NC 27604, 1-(800)-800-7391. Each tree planted within 5 feet of a sidewalk shall receive a root control system called “Biobarrier” or approved equal. “Biobarrier” may be obtained from Reemay Inc., 70 Old Hickory Blvd., Old Hickory, TN 37138, (615)-847-7000. Each tree planted shall receive 20’ by 19 ½” sheet of material installed directly behind the sidewalk. 811.03.01 Planting I. Watering. ADD THE FOLLOWING: For street trees, the
(615)-847-7000. Each tree planted shall receive 20’ by 19 ½” sheet of material installed directly behind the sidewalk. 811.03.01 Planting I. Watering. ADD THE FOLLOWING: For street trees, the initial watering at the time of planting shall be at the rate of 15 gallons per square yard of plant pit area. “TreeGator” drip bag watering system (or approved equal) shall be utilized to maintain damp soil conditions around the root ball after planting. Drip bag shall be replenished once a week throughout the dry season, from May 15 to September 15. Drip bags that are damaged or missing during the watering season shall be replaced at no additional cost to the Township. All “TreeGator” drip bags shall be considered the property of the Township and shall be turned over to Public Works at the completion of the project. 811.03.02 Plant Establishment Period THE THIRD AND FOURTH PARAGRAPHS ARE CHANGED TO: All plantings will be warrantied under the provisions of the project surety as described in Section 108.21. If the Township determines that plants need to be replaced during the warrantee period, replant plants as specified in 811.03.01 within 3 weeks of notification. If replacing outside of the optimal planting season, as specified in Table 811.03.01-1, only use containerized or balled and burlapped plants that are certified as being dug dormant. 2. Maintenance Bond. REPLACE WITH THE FOLLOWING: Plants to be warrantied under the project warranty for the length of the maintenance period. HELEN AVE., LAWRENCE AVE., FLORENCE PL., AND LOWELL AVE., IMPROVEMENTS PROJECT Page 67 of 76
811.04 MEASUREMENT AND PAYMENT THE FOLLOWING ITEMS ARE ADDED: Pay Item Pay Unit SMALL DECIDUOUS TREE, 2.0-2.5 CAL., B&B UNIT THE LAST PARAGRAPH IS REPLACED WITH THE FOLLOWING: The Township will make no payment for plants rendered unacceptable until replaced with healthy specimen of similar species and size. Tree plantings shall include the root control system, drip bag watering system, and water. The Township will make no payment for wood chip mulching associated with planting. All costs shall be included in the price bid for the plant material. The limits for wood chip mulch associated with planting will extend from the center of the plant out to the drip line or edge of the plant pit/bed, whichever is greater. HELEN AVE., LAWRENCE AVE., FLORENCE PL., AND LOWELL AVE., IMPROVEMENTS PROJECT Page 68 of 76
DIVISION 900 – MATERIALS SECTION 902 – ASPHALT 902.01.01 Asphalt Binder THE FIRST TWO PARAGRAPHS ARE CHANGED TO: Use an asphalt binder that is storage-stable and conforms to AASHTO M 332. Include compliance with the elastic response requirement in Figure 1 of AASHTO R 92, if applicable. 902.02.01 Mix Designations PART (4) IS CHANGED TO: 4. “E” The fourth field in the Item description designates the high temperature designation of the performance- graded binder. Options are “64” for PG 64S-22 and “E” for PG 64E-22. 902.02.03 Mix Design THE FOLLOWING IS ADDED TO THE FIRST PARAGRAPH: Unless otherwise approved by the engineer, only one source of supply for hot mix asphalt surface course may be used on the project. 902.02.04 Sampling and Testing A General Acceptance Requirements. THE SECOND PARAGRAPH OF SECTION (A) IS CHANGED TO: For PG 64S-22, ensure that the temperature of the mixture at discharge from the plant or surge and storage bins is at least 290 °F when the ambient temperature is less than 50 °F or is at least 275 °F when the ambient temperature is greater than or equal to 50 °F. For PG 64E-22, ensure that the temperature of the mixture at discharge from the plant or surge and storage bins is at least 10 °F above the manufacturer’s recommended laydown temperature. For mixes produced using a WMA additive or process, ensure that the temperature of the mixture at discharge from the plant or surge and storage bins is at least 10 °F above the WMA manufacturer’s recommended laydown temperature. D. Acceptance Testing and Requirements. PART D IS CHANGED TO: The ME will determine volumetric properties at Ndes for acceptance from samples taken, compacted, and tested at the HMA plant. The ME will compact HMA to the number of design gyrations (N des) specified in Table 902.02.03-2, using equipment according to AASHTO T 312. The ME will determine bulk specific gravity of the compacted sample according to AASHTO T 166. The ME will use the most current QC maximum specific gravity test result in calculating the volumetric properties of the HMA. The ME will determine the dust-to-binder ratio from the composition results as tested by the QC technician. Ensure that the HMA mixture conforms to the requirements specified in Table
e HMA. The ME will determine the dust-to-binder ratio from the composition results as tested by the QC technician. Ensure that the HMA mixture conforms to the requirements specified in Table 902.02.04-1, and to the gradation requirements in Table 902.02.03-1. If the test results are outside of the gradation or volumetric requirements specified in Table 902.02.03-1 or Table 902.02.04-1 for an acceptance sample, immediately run a quality control sample. If the quality control sample is also outside of the requirements specified in Table 902.02.03-1 or Table 902.02.04-1, determine if a plant adjustment is needed and take corrective action to bring the mix into compliance. Take an additional quality control sample immediately after completing the corrective action to ensure that the mix is within the requirements. If the mix is within the requirements based on the quality control sample results, then the ME will HELEN AVE., LAWRENCE AVE., FLORENCE PL., AND LOWELL AVE., IMPROVEMENTS PROJECT Page 69 of 76
immediately take an acceptance sample to test and verify that the composition meet gradation and volumetric requirements specified in Table 902.02.03-1 and Table 902.02.04-1. If 2 consecutive acceptance or quality control samples are outside the gradation or volumetric requirements specified in Table 902.02.03-1 or Table 902.02.04-1, immediately stop production and shipping. After a production stop, obtain ME approval of a plant correction plan before resuming production. Upon restarting production, do not transport mixture to the Project Limits before the results of a quality control sample from the mixture indicate that the mixture meets gradation and volumetric requirements specified in Table 902.02.03-1 and Table 902.02.04-1 and ME approval. The ME will reject mixture produced at initial restarting that does not meet gradation and volumetric requirements specified in Table 902.02.03-1 and Table 902.02.04-1. The ME will test a minimum of 1 sample per 3,500 tons for moisture, basing moisture determinations on the weight loss of an approximately 1,600 gram sample of mixture heated for 1 hour in an oven at 280 ± 5 °F. Ensure that the moisture content of the mixture at discharge from the plant does not exceed 1.0 percent. Table 902.02.04-1 Hot Mix Asphalt Requirements for Control Required Density Voids in Mineral Aggregate (VMA), (% of Theoretical Max. % (minimum) Compaction Dust-to-Binder Levels Specific Gravity) Nominal Max. Aggregate Size, mm Ratio @Ndes1 37.5 25.0 19.0 12.5 9.5 4.75 L, M 95.0 – 97.0 11.0 12.0 13.0 14.0 15.0 16.0 0.6 – 1.3 1. As determined from the values for the maximum specific gravity of the mix and the bulk specific gravity of the compacted mixture. Maximum specific gravity of the mix is determined according to AASHTO T 209.
m the values for the maximum specific gravity of the mix and the bulk specific gravity of the compacted mixture. Maximum specific gravity of the mix is determined according to AASHTO T 209. Bulk specific gravity of the compacted mixture is determined according to AASHTO T 166. 902.02.04 Sampling and Testing THE FOLLOWING SUBSECTION IS ADDED: E. Acceptance of HMA. The Department may accept the HMA as specified in 902.02.04.A through 902.02.04.E by employing staff or an independent testing agency at the HMA plant during production. The inspector who performs the quality assurance sampling shall be certified by the Society of Asphalt Technologists of New Jersey as an Asphalt Plant Technologist, Level 2. Form “DS-8 HMA Testing Summary Report – State Aid” provided on the Local Aid Website must be utilized by the Laboratory to report their findings to the RE. Alternatively, the Department may accept the HMA by Certification of Compliance according to 106.07. SECTION 903 – CONCRETE 903.01 CEMENT THE ENTIRE SUBSECTION TEXT IS CHANGED TO: Use cement, listed on the QPL, that is either portland cement or blended hydraulic cement and conforms to the following: Portland Cement, Type I, II, and Type III ................................................................................................ ASTM C 150 Blended Hydraulic Cement, Type IS, IP, and IL ..................................................................................... ASTM C 595 Only use Type III portland cement for Class V concrete, prestressed Items, and precast Items. Use portland cement pre-blended with a maximum of 25 percent fly ash, by weight, or a maximum of 5 percent silica fume by weight, or with a maximum of 50 percent slag by weight for blended hydraulic cement Type IS or IP. Use portland cement pre-blended with a minimum of 5 percent limestone content and a maximum of 15 percent limestone content by HELEN AVE., LAWRENCE AVE., FLORENCE PL., AND LOWELL AVE., IMPROVEMENTS PROJECT Page 70 of 76
weight for blended hydraulic cement Type IL. Ensure that a scaling test according to ASTM C 672 is completed on the mix design if more than 30 percent slag is used and that the concrete has a visual rating less than 3 after 50 cycles. Do not add additional mineral admixtures to blended hydraulic cements Type IS or IP at the concrete plant unless approved by the ME. The use of additional mineral admixtures in blended hydraulic cement Type IL at the concrete plant is permitted if the mineral admixture is listed on the QPL Do not mix different brands of cement, the same brand of cement from different mills, or different types of cement. Provide suitable means for storing and protecting the cement against dampness. The ME will reject cement that has become partially set or that contains lumps of caked cement. Ensure that the temperature of the cement at the time of delivery to the mixer does not exceed 160 °F. SECTION 911 – SIGNS, SIGN SUPPORTS, AND DELINEATORS 911.01.01 Materials B. Retroreflective Sheeting. TABLE 911.01.01-2 IS CHANGED TO: THE SECOND SIGN TYPE IN TABLE 911.01.01-2 IS CHANGED TO: Table 911.01.01-2 Allowable Sign Sheeting Types Sign Type Test Method Type Type III, Type VIII, Regulatory and Warning Signs ASTM D 4956 Type IX or Type XI1 Type III, Type VIII, Guide Signs Mounted on Steel “U” or Square Tube Posts ASTM D 4956 Type IX or Type XI Guide Signs Mounted on Overhead Sign Structures, Breakaway Sign Type VIII, Type IX or ASTM D 4956 Supports, or Non-breakaway Sign Supports
ASTM D 4956 Supports, or Non-breakaway Sign Supports Type XI2 1. Ground-mounted signs with white background shall be ASTM Type IX. 2. Do not use ASTM Type XI sheeting with any existing sign lighting improvement or signs that are lit. 911.01.02 Fabrication A. Sign Panels. THE SECOND PARAGRAPH IN PART A IS CHANGED TO: Fabricate flat sheet signs from a single piece of sheet aluminum without joints, using the thicknesses specified in Table 911.01.02-1. Drill or punch 3/8 inch diameter holes in the sign blank for attachment to sign supports. Locate holes according to the 2004 Edition of Standard Highway Signs and Markings Book. If the panel is larger than 5 feet in any dimension, reinforce the panel with z-bars. THE THIRD PARAGRAPH OF PART A IS CHANGED TO: For multiple panel signs, use 1 foot wide extruded sections bolted together. Join sign panel sections together at the flanges with 3/8 inch bolts. Attach the sign panels to vertical supports, ensuring that the span between vertical supports is a maximum of 18 feet. Do not use extruded sign panels with steel “U” or square tube post sign supports. Use the same material and color for trim molding that is used for the sign face. C. Legends and Borders. THE FIRST PARAGRAPH IN PART C IS CHANGED TO: The legend for each sign consists of letters, numerals, shields, and other symbols. Use Series E Modified 2000 lettering that conforms to the 2004 Edition of Standard Highway Signs and Markings Book. Ensure that the lettering HELEN AVE., LAWRENCE AVE., FLORENCE PL., AND LOWELL AVE., IMPROVEMENTS PROJECT Page 71 of 76