Town CrierWest Orange, New Jersey
← Back to search

Packet · May 29, 2012

Public Township Council Meeting — Packet

Preserved file SHA-25691ae36a26bce5c970d213c84f829b732869948187163476d4c988f3dfccef5a8

Indexed text · page 254

Show all pages
Page 254

DRAFT PROPOSED REVISIONS – OCTOBER 2011 25-51.8 Conditional Use Requirements. No conditional use application shall be considered complete unless it fully conforms with subsections 25-51.2 and 25-51.6 as well as the following requirements: a. A notation indicating the section of this chapter that allows the conditional use as proposed. b. A listing of the conditional use standards that apply to the subject proposal. c. A list of identical or similar uses within the Township or close proximity to it. d. A graphic and/or written description of the area surrounding the subject property. (Ord. No. 904-88 § 25-8.6H) 25-51.9 "C" Variance Requirements. No "c" or bulk variance application shall be considered complete unless it fully conforms with subsection 25-51.2 as well as the following requirements: a. A map, either in conformance with subsections 25-51.3, 25-51.4, 25-51.5 and 25-51.6 or if the application is to be bifurcated, a separate map, signed and sealed by an architect, engineer, planner or surveyor which provides sufficient data (i.e., setbacks, lot area, existing and proposed structures, etc.) upon which a decision can be based. b. A graphic and/or written description of the area surrounding the subject property. c. A description of the alternatives that were considered. d. A statement or legal brief which clarifies why the "c" variance should be granted and the specific hardship involved. Particular attention should be paid to the contents of N.J.S.A. 40:55D-70c, applicable case law and relevant Township Ordinances and N.J. Statutes. (Ord. No. 904-88 § 25-8.6I) 25-51.10 "D" Variance Requirements. No "d" or use variance application shall be considered complete unless it fully conforms with subsection 25-51.2 as well as the following requirements: a. A map, either in conformance with subsection 25-51.3, 25-51.4, 25-51.5 or 25-51.6 or if the application is to be bifurcated, a separate map, signed and sealed by an architect, engineer, planner or surveyor which provides sufficient data (i.e. setbacks, lot area, existing and proposed structures, etc.) upon which a decision can be based. b. A graphic and/or written description of the area surrounding the subject property. c. A description of the alternatives that were considered. d. A statement or legal

Page 254

decision can be based. b. A graphic and/or written description of the area surrounding the subject property. c. A description of the alternatives that were considered. d. A statement or legal brief which clarifies why the "d" variance should be granted and the "specific special reasons" or hardship that pertain to the subject proposal. Particular attention should be paid to the contents of N.J.S.A. 40:55D-70d, applicable case law and relevant Township Ordinances and N.J. Statutes. c. A planning report prepared by a licensed Professional Planner and a traffic report prepared by a licensed Professional Engineer. The Board may waive the provision of such reports at its discretion. (Ord. No. 904-88 § 25-8.6J) 236

File revisions (1)