Packet · May 29, 2012
Public Township Council Meeting — Packet
91ae36a26bce5c970d213c84f829b732869948187163476d4c988f3dfccef5a8Indexed text · page 276
Show all pagesDRAFT PROPOSED REVISIONS – OCTOBER 2011 (a) Traffic counts; (b) Existing and projected traffic patterns; (c) Quality of roads and sidewalks in the area; and (d) All such other factors as it may deem relevant to the needs created by the proposed development. 2. With respect to drainage facilities, the approving authority may consider: (a) The relationship between the areas of the subdivision or site plan and the area of the total drainage basin of which the subdivision or site plan is a part; (b) The proposed use of land within the subdivision or site plan and the amount of land area to be covered by impervious surfaces on the land within the subdivision or site plan; and (c) The use, condition or status of the remaining land area in the drainage basin. 3. With respect to water, gas and electric supply and distribution facilities, the approving authority may consider the use requirements of the use proposed for the subdivision or site plan and the use requirements of all other properties to be benefited by the improvements. 4. With respect to sewerage facilities, the approving authority may consider: (a) The anticipated volume of effluent from the use proposed for the subdivision or site plan and the anticipated volume of effluent from all other properties to be benefited by the improvements; (b) The types of effluent anticipated and particular problems requiring special equipment or added costs. (1972 Code § 24-9.5; Ord. No. 480-78) 32-9.6 Performance Guarantees. a. Required. The applicant shall be required to provide, as a condition for final approval of his/her development application, a performance guarantee running to the Township as follows: 1. If the improvement is to be constructed by the applicant under subsection 32-12.1 above or under paragraph b and 1(c) above, a performance bond with surety in an amount equal to the estimated cost of the improvement, or as to any part of the improvement, or as to any part of the improvement that is to be acquired or installed by the Township under subsection 32-9.3, a
d cost of the improvement, or as to any part of the improvement, or as to any part of the improvement that is to be acquired or installed by the Township under subsection 32-9.3, a performance bond equal to the estimated cost of such acquisition or installation by the Township; 2. If the improvement is to be constructed by the Township as a general improvement under paragraph b, 1(c) above, a performance bond equal to the amount of the excess of the estimated cost of the improvement over the estimated total amount by which all properties, including the development property, will be specially benefited thereby; and 3. If the improvement is to be constructed by the Township as a local improvement under paragraph b, 1(b) above, a performance bond equal to the amount referred to in the preceding paragraph a, 2 immediately above, plus the estimated amount by which the development property will be specially benefited by the improvement. 4. All estimates of cost shall be made by the Township Engineer. All improvements shall be made on or before an agreed date. b. Form; Term; Reduction of Amount. 258
File revisions (1)
- Sep 29, 2026
91ae36a26bce2,956,350 bytes