Packet · May 29, 2012
Public Township Council Meeting — Packet
91ae36a26bce5c970d213c84f829b732869948187163476d4c988f3dfccef5a8Indexed text · page 52
Show all pagesDRAFT PROPOSED REVISIONS – OCTOBER 2011 2. The maximum release rate of storm water from all developments requiring detention shall not exceed the storm water runoff rate from the area in its natural undeveloped state, unless the applicant can show by his/her detailed plans, cross sections and calculations that the carrying capacity of the ultimate receiving stream in the Township has been or will be improved to adequately serve the area in question. 3. The live detention storage to be provided shall be calculated on the basis of the one hundred (100) year frequency rainfall. The detention volume required will be that necessary to handle the runoff of a volume discharged at the approved release rate. d. Enforcement. 1. The Township Engineer is hereby designated the Enforcement Officer under this subsection. 2. The Construction Official shall withhold issuing a Certificate of Occupancy for any project which is not in full compliance with this subsection as approved by the Township Engineer or his/her designated representative. (Ord. No. 904-88 § 25-5.2K) Comment [PG34]: addressed elsewhere in ordinance 25-8.12 Principal Uses. There shall be no more than one (1) principal use upon any single lot, except: a. In B-1 and B-2 Districts, residential uses shall be permitted on the second floor or above in a building which has a permitted commercial or retail use on the first floor. b. All proposed mixed-uses must comply with all health and building code regulations, including Certificate of Continued Occupancy requirements. Off-street parking shall be provided as required for each individual use, except that shared parking shall be permitted for a mixed- use development containing a residential use, per Section 25-12.2a3. c. All commercial/retail uses currently on the street level cannot be converted to residential use. d. Mixed uses and multiple principal uses on one lot shall be permitted in the B-1, B-2, P-C, O-R and I Districts. (Ord. No. 904-88 § 25-5.2L; Ord. No. 1035-90;
to residential use. d. Mixed uses and multiple principal uses on one lot shall be permitted in the B-1, B-2, P-C, O-R and I Districts. (Ord. No. 904-88 § 25-5.2L; Ord. No. 1035-90; Ord. No. 1336-95 § 1) 25-8.13 As Built Drawings. As built drawings shall be submitted to the Engineering and Building Departments of the Township for all commercial and industrial projects, and for all residential projects with more than five (5) dwelling units in a subdivision. All such drawings shall be certified by a New Jersey State licensed engineer, architect or surveyor under seal, whoever is appropriate. No final Certificate of Occupancy shall be issued until an "as built" drawing or drawings for the project are submitted and approved by the Construction Official, Township Engineer and Zoning Officer. (Ord. No. 904-88 § 25- 5.2M; Ord. No. 1216-93) 25-8.14 Recycling Facilities.* a. There shall be included in any new multifamily housing development that requires subdivision or site plan approval an indoor or outdoor recycling area for the collection and storage of residentially-generated recyclable materials. The dimensions of the recycling area shall be sufficient to accommodate recycling bins or containers which are of adequate size and number, and which are consistent with anticipated usage and with current methods of collection in the area in which the project is located. The dimensions of the recycling area and *Editor's Note: See also Chapter XXXII, Land Subdivision, Section 32-13, Recycling Area Requirements. 34
File revisions (1)
- Sep 29, 2026
91ae36a26bce2,956,350 bytes