Ms. Wolfe stated that the applicant reached out to the Community House, the school adjacent to the property, to determine whether it had any concerns about the project. She stated that she could not provide hearsay testimony but indicated that the school had no objections to the project. The engineer, Jordan Cecini, entered on the record; he was sworn under oath. His credentials were accepted by the board and he testified to the following: Mr. Cecini stated that the plans he was presenting were the current plans submitted to the Board, with a last revised date of May 26, 2026. Ms. Wolfe confirmed that this was the plan set previously introduced as Exhibit A2. Mr. Cecini stated that he was engaged to perform the engineering design for the drawings, focusing primarily on drainage, parking, lighting, and associated site plan requirements. He stated that he worked closely with the architect, Jorge Masto Priestro, in developing the plan. Mr. Cecini began with the drainage design and referred to Sheet C1.07. Mr. Cecini stated that, because this was a major development, the project had to control total suspended solids (TSS) as well as additional runoff under the new New Jersey requirements. Mr. Cecini described two separate drainage designs. Because a large amount of rainwater would be collected from the roof, one stormwater detention basin would outflow into the storm sewer in a controlled manner. Mr. Cecini stated that a pervious pavement system would collect direct runoff from the parking stalls along the edge of the property. A swale would collect the runoff and direct it into an aquaponic filter that would remove total suspended solids before the water entered the basin. Mr. Cecini stated that the piping was designed for overflows if the project exceeded the design storm and that the system complied with the stormwater design criteria. Ms. Wolfe asked Mr. Cecini to discuss the existing drainage conditions and whether the proposed system would be an improvement. Mr. Cecini stated that the proposed system would definitely be an improvement. He stated that no inlets collecting runoff from the existing site were indicated on the survey and that he did not recall seeing any during his site visit. Mr. Cecini stated that the existing site was 100% impervious coverage and that all runoff was going into the stormwater system. Mr. Cecini stated that the new

Page 15

ecall seeing any during his site visit. Mr. Cecini stated that the existing site was 100% impervious coverage and that all runoff was going into the stormwater system. Mr. Cecini stated that the new design would reduce runoff and collect a good portion of it into the stormwater collection system, including runoff from the roof area. Mr. Cecini stated that the project would also remove total suspended solids from the roadway and parking lot, including oil residues and dirt from vehicles. Mr. Cecini described the proposed green infrastructure, including pervious pavers. He stated that a portion of the parking lot would be converted from asphalt to pavers with gaps that allow water to pass through into a gravel basin, where the water would be stored within the gravel. Mr. Cecini stated that the pervious pavement system was designed in compliance with the New Jersey Best Practices Manual and its recommendations for green infrastructure. Ms. Wolfe asked about the proposed rain gardens. Mr. Cecini stated that the rain gardens would be located in the swale and would collect water flowing from the asphalt down the driveway. A structure within the rain gardens would collect the water and direct it into the stormwater system. Mr. Cecini stated that the lighting plan met the ordinance criteria, with 0.5 foot-candles that did not protrude outside the area.

File revisions (1)