August 12, 2026, Planning Board Regular Meeting Minutes
e70fb166374efcc58fdf24a4881520d4bb1d2f20e40efa25c502122978b84f93Indexed text · page 19
Show all pageso Mr. Cecini stated that he had a May 26 report and offered to send it to Mr. Valesi so that the comments could be reviewed and any requirements necessary to comply with the ordinance could be addressed. Mr. Valesi asked whether Mr. Cecini would agree to comply with the comments contained in the engineering report. Mr. Cecini stated that he would comply as long as the comments were within the ordinance. Mr. Valesi asked whether the applicant had identified the location of the ADA EV space. Mr. Cecini stated that the current plan did not have an ADA EV space, but that one of the ADA stalls could be converted to an ADA EV space. He noted that some parking would have to be moved because of issues regarding the Fire Department’s preferred location for those spaces. PUBLIC QUESTIONS Mr. Kevin Malanga, Ridge Road, asked Mr. Cecini about the collection of runoff from the roof. Mr. Cecini stated that the roof runoff would be collected through storm pipes or drains on the roof, which would go to a leader and then connect into the runoff and ultimately the basin. Mr. Malanga asked where the gutters and leaders would be located on the building. Mr. Cecini stated that their specific locations had not been established for a zoning plan application because that level of detail is typically provided with the construction documents. He stated that the drainage plan does provide a location for the runoff to enter the drainage system. Mr. Malanga asked whether there would be gutters for the roof along Main Street. Mr. Cecini stated that there would be some form of drainage collection, which could be internal to the roof or could use exterior gutters. Mr. Malanga asked about a structure that is an extension of the roof attached to the building along the Main Street side. Mr. Cecini stated that the architect would be more appropriate to address that issue because he is handling the site plan. Mr. Malanga asked whether Mr. Cecini was aware of rain gutters for that structure. Mr. Cecini stated that he was not responsible for the building design and that he is the site plan engineer. He explained that he tells the building designers where the pipe must be placed so that the water enters his storm collection system. Mr. Malanga asked whether Mr. Cecini had designed a collection system for the structure along Main Street. Mr. Cecini stated that he designed a system that collects
enters his storm collection system. Mr. Malanga asked whether Mr. Cecini had designed a collection system for the structure along Main Street. Mr. Cecini stated that he designed a system that collects the rainwater where it ends, but that the conveyance system is part of the building design, which is typically completed after approvals. Mr. Malanga asked whether Mr. Mastropietro had discussed rain gutters for the building with Mr. Cecini. Mr. Cecini stated that he believed the matter had been discussed as part of Mr. Mastropietro’s prior testimony and stated that he would leave it to Mr. Mastropietro to address in his testimony. o Mr. Malanga stated that he had asked Mr. Mastropietro about the issue and that Mr. Mastropietro had said there would be rain gutters, so he was surprised to hear that the matter had not been discussed with Mr. Cecini. PRESENTATION The traffic engineer, Mr. Gary Dean, entered on the record; he was sworn under oath. His credentials were accepted by the board and he testified to the following:
File revisions (1)
- Nov 3, 2026
e70fb166374e25,949,455 bytes