Minutes · Aug 12, 2026
August 12, 2026, Planning Board Regular Meeting Minutes
e70fb166374efcc58fdf24a4881520d4bb1d2f20e40efa25c502122978b84f93Indexed text · page 28
Show all pagesMr. Mastropietro testified that having the loading space parallel to the sidewalk was the safest approach. He stated that going in and out through a loading dock is dangerous because delivery vehicles would have to cross the sidewalk multiple times, particularly for 20- to 30-minute deliveries. Mr. Mastropietro stated that he believed it was safer to avoid having delivery vehicles repeatedly cross the sidewalk. BOARD QUESTIONS Chairman Bagoff asked Mr. Mastropietro to address Mr. Malanga's question concerning the water collection system on the roofline and how it would drain into the stormwater management system. Mr. Mastropietro reiterated that the drainage could be hidden and showed another image illustrating how the system could be constructed. Mr. Mastropietro testified that the method had been used on other buildings and was not an idea being created solely for this project. He explained that the drainage would go inside the building and down through the building. PRESENTATION Msi Wolfe stated that reducing the proposed physical spaces to 43 would be ideal. She explained that they may not need all of the space, but did not want to have to return if they could not make it work. She stated that, due to the Fire Department’s concerns regarding placement of the EV space near the building, it was'more difficult to determine where to place the ADA space. Ms. Wolfe confirmed that there was only one EV space at issue. The professional planner, Kate Keller, entered on the record; she was sworn under oath. Her credentials were accepted by the board and she testified to the following: Ms. Keller reviewed the existing site conditions, utilizing a previously marked presentation slide. She described the property as a relatively large site of almost three- quarters of an acre, approximately 0.7 acres, located in the heart of one of the downtown nodes. o She noted that the property had previously been a vacant pharmacy site with substantial parking and discussed the negatives of the prior site design. Ms. Keller stated that the existing site had approximately 99% impervious coverage and that the frontage was essentially non-existent. She explained that the proposal would replace the existing one-story, relatively nondescript buildings and parking areas with a permitted and encouraged supermarket/retail use. Ms. Keller described the proposed use as an
he proposal would replace the existing one-story, relatively nondescript buildings and parking areas with a permitted and encouraged supermarket/retail use. Ms. Keller described the proposed use as an appropriately scaled neighborhood market with approximately 13,000 square feet of actual retail space. She emphasized that the proposal was not a ShopRite or a large-scale market, but rather something designed to fit the context of the downtown area. Ms. Keller noted that the property has three street frontages: Main Street, Irwin Place, and a small Prospect Place frontage. She stated that, although she would not characterize the situation strictly as a C1 hardship because the lot was not assembled for that purpose, having three frontages represented some hardship with respect to certain of the requested variances. Ms. Keller stated that the requested variances could be considered in several categories, including existing conditions, parking and loading, and other site-related requirements. Ms. Keller identified the existing rear yard setback as 2 feet, 11 inches, which is also what is proposed. She noted that lot coverage would be reduced from 99% to 97%. 28
File revisions (1)
- Nov 3, 2026
e70fb166374e25,949,455 bytes