Supporting Documentation · Oct 12, 2022
PB 22 10 Altera 769 LLC Filed Application with Exhibits Final Site Plan Phase 2
df1f56d8dfa009ca73b3855c637d68cc5e7491530b6196991d8f0dc5018cdfe1Indexed text · page 201
Show all pagesleast once a month during the growing season and grass should not be allowed to grow more than 1 to 2 inches between cuttings. Allowing the grass to grow more than this amount prior to cutting it may result in damage to the grass’ growing points and limit its continued healthy growth. b) Grass Maintenance Grassed areas require periodic fertilizing, de-thatching and soil conditioning in order to maintain healthy growth and to provide bank stabilization. Additionally, provisions should be made to re-seed and re-establish grass cover in areas damaged by sediment accumulation, stormwater flow, or other causes. These tasks should be performed, or at least evaluated, on a quarterly basis. c) Vegetative Cover Trees, shrubs, and ground cover require periodic maintenance, including fertilizing, pruning, and pest control in order to maintain healthy growth. Vegetated areas must be inspected at least annually for erosion and scour as well as unwanted growth, which should be removed with minimum disruption to the remaining vegetation. The basin should be evaluated regularly to determine whether excessive plant growth is evident. A correction in the application of fertilizers can often solve these problems. Weeds, which have become a problem, can be cleared through harvesting by professional maintenance technicians. Note: All use of fertilizers, mechanical treatments, pesticides and other means to ensure optimum vegetation health must not compromise the intended purpose of the storm water management facility. All vegetation deficiencies should be addressed without the use of fertilizers and pesticides whenever possible. d) Removal and Disposal of Trash and Debris All storm water management components expected to receive and/or trap debris and sediment must be inspected for clogging and excessive debris and sediment accumulation at least
nagement components expected to receive and/or trap debris and sediment must be inspected for clogging and excessive debris and sediment accumulation at least four times annually as well as after every storm exceeding one inch of rainfall. Such components may include the basin, stormwater conveyance network (piping and inlet), flared end sections, bottoms, riprap or gabion aprons, trash racks and inflow points. All components expected to receive and/or trap debris and sediment must be inspected for clogging and excessive debris and sediment accumulation at least four times annually as well as after every storm exceeding 1 inch of rainfall. Such Altera Development Company, LLC -5- Revised August 2022 DECPC #2530-99-006
File revisions (1)
- Sep 29, 2026
df1f56d8dfa054,605,034 bytes