Show all pagescomponents may include inlets and diversion structures, fore bays, sand beds, and overflows. Removal of trash and debris will prevent possible damage to trash racks and outlets, vegetated areas and eliminate potential mosquito breeding habitats. Disposal of debris and trash must comply with all local, county, state, and federal waste flow control regulations. Only suitable disposal and recycling sites should be utilized. e) Sediment Removal and Disposal The basin should also be evaluated for excessive deposition of sediment. Accumulated sediment should be removed before it threatens the storage volume of the basin. Before de-sedimentation activities are performed, consideration should be given to evacuating all standing water from the basin. This may be accomplished by clearing any blocked openings of the outlet structure or by mechanical means such as pumping. If stable soil conditions exist on-site, sediment deposition should not be an excessive maintenance issue. Should a recurrent stabilization situation develop, the inspector should identify the upstream sources of sediment and recommend required stabilization measures. Sediment removal should take place when all runoff has drained from the sand bed and the sand is reasonably dry. In addition, runoff should be drained or pumped from fore bays with permanent pools before removing sediment. Disposal of debris, trash, sediment, and other waste material should be done at suitable disposal/recycling sites and in compliance with all applicable local, state, and federal waste regulations. f) Mechanical Components Mechanical components such as valves, sluice gates, pumps, fence gates, locks, and access hatches, should remain functional at all times. Regularly scheduled maintenance should be performed in accordance with the manufactures’ recommendations.
cess hatches, should remain functional at all times. Regularly scheduled maintenance should be performed in accordance with the manufactures’ recommendations. Additionally, all mechanical components should be operated at least once every three months to assure their continued performance. g) Elimination of Potential Mosquito Breeding Habitats The most effective mosquito control program is one that eliminates potential breeding habitats. Almost any stagnant pool of water can be attractive to mosquitoes, and may become the source of a large mosquito population. A maintenance program dedicated to eliminating potential breeding areas is preferable Altera Development Company, LLC -6- Revised August 2022 DECPC #2530-99-006
File revisions (1)
- Sep 29, 2026
df1f56d8dfa054,605,034 bytes