Supporting Documentation · Oct 12, 2022
PB 22 10 Altera 769 LLC Filed Application with Exhibits Final Site Plan Phase 2
df1f56d8dfa009ca73b3855c637d68cc5e7491530b6196991d8f0dc5018cdfe1Indexed text · page 204
Show all pagesj) Inspection of the Soil Bed The soil bed should be inspected at least twice annually. The infiltration rate of the soil bed material may also be retested. If the water fails to infiltrate 72 hours after the end of the stormwater quality design storm, corrective measures must be taken. k) Vegetation Maintenance All landscaped areas within the aboveground basin shall be periodically inspected a minimum of once per month and every two weeks during growing season or after each mowing session. In general, mowing should occur at least once a month during the growing season. Clippings from the mowing operations shall be removed and disposed of in accordance with all local, state and federal regulations. Reseeding, if required, shall occur within spring or early fall. Summer and fall seeding can be successful with a light mulching of weed-free straw to conserve moisture. All landscaped areas shall be inspected for invasive plant species. Invasive species should be removed immediately and properly disposed of at an approved disposal site. l) Inspection and Reporting: Regularly scheduled inspections of the facility should be performed by a consulting Professional Engineer. The primary purpose of the inspections is to ascertain the operational condition and safety of the facility. Inspections will also provide information on the effectiveness of regularly scheduled Preventative and Aesthetic Maintenance procedures. It should be noted that, in addition to regularly scheduled inspections, an informal inspection should be performed during every visit to stormwater management facilities by maintenance or supervisory personnel. The recording of all maintenance work and inspections provides valuable data on the condition of the stormwater management facilities. Review of this information will also help to establish more efficient and beneficial
s valuable data on the condition of the stormwater management facilities. Review of this information will also help to establish more efficient and beneficial maintenance procedures and practices. All recorded information should be directed to the owner of the facility for review and subsequent follow-up on recommendations. Inspection and maintenance checklists and logs are included in the Appendix of this manual. Altera Development Company, LLC -8- Revised August 2022 DECPC #2530-99-006
File revisions (1)
- Sep 29, 2026
df1f56d8dfa054,605,034 bytes