Show all pages2. Corrective Maintenance Procedures Corrective Maintenance is required on an emergency or non-routine basis to correct problems or malfunctions and to restore the intended operation and safe condition of the basin. Bioretention: a) Removal of Debris and Sediment Sediment, debris and trash which threaten the discharge capacity of the basin should be removed immediately and properly disposed. As noted previously, it is recommended that all water be evacuated from the basin with a pump before any significant amount of sediment, settled debris or trash is removed from the basin. The lack of an available disposal site should not delay the removal of trash, debris and sediment. Temporary disposal sites should be utilized if necessary. b) Structural Repairs Structural damage to outlet and inlet structures, trash racks, access hatches, roadways and headwalls as a result of vandalism, flood events, settlement or other causes must be repaired promptly. The urgency of the repairs will depend upon the nature of the damage and its effects on the safety and operation of the facility. The analysis of structural damage and the design and performance of structural repairs should only be undertaken by the consulting Professional Engineer. c) Embankment and Slope Repairs Damage to embankments, and side slopes must be repaired promptly. This damage can be the result of rain or flood events, vandalism, animals, vehicles or neglect. Typical problems include settlement, scouring, cracking, sloughing, seepage and rutting. The urgency of the repairs will depend upon the nature of the damage and its effect on the safety and operation of the facility. The analysis of the damage and the design and performance of geotechnical repairs should only be undertaken by qualified personnel and under the direction of a consulting Professional Engineer. All
and performance of geotechnical repairs should only be undertaken by qualified personnel and under the direction of a consulting Professional Engineer. All basin embankments shall be inspected quarterly and after each significant storm greater than one (1) inch of rainfall. Any damage or indication of erosion shall be immediately inspected by a professional engineer. d) Dewatering It may be necessary to remove ponded water from within a malfunctioning basin. This ponding may be the result of a blocked principal outlet or poor bottom drainage. Altera Development Company, LLC -9- Revised August 2022 DECPC #2530-99-006
File revisions (1)
- Sep 29, 2026
df1f56d8dfa054,605,034 bytes