Show all pagesPortable pumps may be necessary to remove the ponded water temporarily until a permanent solution can be implemented. e) Weed Harvesting It may be necessary to remove congested weeds from the basin. Companies with specialized harvesters should be contacted to perform these operations. Note that such work may require the approval of various regulatory agencies. f) Extermination of Mosquitoes If neglected, the basin can become an ideal mosquito breeding area. The extermination of mosquitoes will usually require the services of the County Mosquito Commission. If mosquito control in the facility becomes necessary, the preventative maintenance program should be re-evaluated, and more emphasis should be placed on control of mosquito breeding habitats. g) Erosion Repair Vegetative cover or other protective measures are necessary to prevent the loss of soil due to the forces of wind and water. Where a re-seeding program has not been effective in maintaining a non-erosive vegetative cover, or other factors have exposed soils to erosion, corrective steps should be initiated to prevent further loss of soil that may result in danger to the stability of the facility. Soil loss can be controlled by a variety of materials and methods, including rip-rap, gabion lining, geotextile fabrics, sod, seeding, concrete lining and re-grading. h) Elimination of Trees, Brush, Roots and Animal Burrows The stability of embankments can be impaired by large roots and animal burrows. Additionally, burrows can present a safety hazard for maintenance personnel. Trees and brush with extensive, woody root systems should be completely removed to prevent destabilization and the creation of seepage routes. Roots should also be completely removed to prevent decomposition within the embankment. Root voids and burrows should be filled with material
seepage routes. Roots should also be completely removed to prevent decomposition within the embankment. Root voids and burrows should be filled with material similar to the existing material, and capped just below grade with stone, concrete or other material. If the filling of the burrows does not discourage the animals from returning, further measures should be taken to either move the animal population or to make critical areas of the facility unattractive to them. Altera Development Company, LLC - 10 - Revised August 2022 DECPC #2530-99-006
File revisions (1)
- Sep 29, 2026
df1f56d8dfa054,605,034 bytes