Supporting Documentation · Oct 12, 2022
PB 22 10 Altera 769 LLC Filed Application with Exhibits Final Site Plan Phase 2
df1f56d8dfa009ca73b3855c637d68cc5e7491530b6196991d8f0dc5018cdfe1Indexed text · page 208
Show all pagesj) Inspection of the Soil Bed k) Vegetation Maintenance l) Inspection and Reporting Corrective Maintenance – Bioretention basin a) Removal of Debris and Sediment b) Structural Repairs c) Embankment and Slope Repairs d) Dewatering e) Weed Harvesting f) Extermination of Mosquitoes g) Erosion Repair h) Elimination of Trees, Brush, Roots, and Animal Burrows i) Snow and Ice Removal j) Basin Drain Time Aesthetic Maintenance a. Grass Trimming/Landscape Maintenance b. Control of Weeds Altera Development Company, LLC - 12 - Revised August 2022 DECPC #2530-99-006
File revisions (1)
- Sep 29, 2026
df1f56d8dfa054,605,034 bytes