Supporting Documentation · Oct 12, 2022
PB 22 10 Altera 769 LLC Filed Application with Exhibits Final Site Plan Phase 2
df1f56d8dfa009ca73b3855c637d68cc5e7491530b6196991d8f0dc5018cdfe1Indexed text · page 218
Show all pagesMAINTENANCE WORK ORDER AND CHECKLIST FOR STORMWATER MANAGEMENT FACILITIES NAME OF FACILITY: ____________________________________________________________________________________________________________________________ LOCATION: _____________________________________________________________________________________________ DATE: ________________________________________ WEATHER: ________________________________________________________ WORK STARTED: _______________________________ MAINTENANCE PERFORMED BY: ____________________________________ WORK COMPLETED: _______________________________ A. PREVENTATIVE MAINTENANCE ITEMS ITEMS WORK ITEMS COMMENTS AND SPECIAL INSTRUCTIONS REQUIRED DONE 1. GRASS CUTTING A. BOTTOMS B. EMBANKMENTS AND SIDE SLOPES C. PERIMETER AREAS D. ACCESS AREAS AND ROADS E. OTHERS 2. GRASS MAINTENANCE A. FERTILIZING B. RE-SEEDING C. DE-THATCHING D. PEST CONTROL E. OTHERS 3. VEGETATIVE COVER A. FERTILIZING B. PRUNING C. PEST CONTROL D. POISONOUS PLANTS E. OTHERS 4. TRASH AND DEBRIS REMOVAL A. BOTTOMS B. EMBANKMENTS AND SIDE SLOPES C. PERIMETER AREAS D. ACCESS AREAS AND ROADS E. INLETS F. OUTLETS AND TRASH RACKS G. OTHERS 5. SEDIMENT REMOVAL A. INLETS B. OUTLETS AND TRASH RACKS C. BOTTOMS D. OTHERS 6. PEST CONTROL A. GEESE B. MOSQUITO BREEDING C. RODENTS / RODENT HOLES D. OTHERS 7. STRUCTURAL REPAIRS A. PIPES B. FLARED END SECTIONS/HEADWALLS C. INLETS D. MANHOLES E. OUTLET CONTROL STRUCTURES F. RIP-RAP G. EMERGENCY SPILLWAY H. ACCESS AREA / ROADS I. FENCE J. TRASH RACKS K. OTHERS
File revisions (1)
- Sep 29, 2026
df1f56d8dfa054,605,034 bytes