Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Oct 12, 2022

PB 22 10 Altera 769 LLC Filed Application with Exhibits Final Site Plan Phase 2

Preserved file SHA-256df1f56d8dfa009ca73b3855c637d68cc5e7491530b6196991d8f0dc5018cdfe1

Indexed text · page 8

Show all pages
Page 8

J. VERIFICATION AND AUTHORIZATION SIGNATURE IS REQUIRED FOR ALL OF THE FOLLOWING: APPLICANT’S VERIFICATION I hereby certify that the above statements made by me and the information contained in the papers submitted in connection with this application are true. I am aware that if any of the foregoing statements are willfully false, Iam subject to punishment. Applicant’s Signature: lO pe oe Date: E/yo, ‘hed behalf of Aleta 769, LLC CONTINUANCE Should the Planning Board/Zoning Board of Adjustment have a full and heavy agenda, or discussion and meeting regarding this application requiring carrying the matter past the statue time limit, the applicant grants permission for such an extension. Applicant’s Signature: BAN Date: AWA 2 On behalf of Aftera 769, LLC OWNER’S AUTHORIZATION ~— MUST BE SIGNED On behalf of Attera 769, .Lc, I hereby certify that I reside at 5910 N. Central Expressway, Suite 1360, Dallas in the County of Dallas and the State of Texas : and that I am the owner of all that certain lot, piece or parcel of land known as Block(s) 16615 Lot(s) 9 on the Tax Map of West Orange which property is the subject of the above application, and that said application is hereby authorized by me. Furthermore, I authorize inspection of the site which is the subject of this application. Owner’s Signature: PHA aA Date:__ 4) old, ‘ On behalf of Altéra 769, LLC THIS APPLICATION DOES NOT RELIEVE THE APPLICANT FROM COMPLYING WITH OTHER TOWNSHIP ORDINANCES SUCH AS THE TREE REMOVAL ORDINANCE AND OBTAINING THE NECESSARY APPROVALS AND PERMITS UNDER SUCH ORDINANCES. TAPLANNING.BRD Document Library\PB-ZBA Application 4-20-15.doe SS

File revisions (1)