Supporting Documentation · Feb 12, 2025
EX Pool 8 Full Matarrazo Drainage System Approved by Town 3623
232def4f084312756cd593875015a95306c097a4d513494b51f90adfdecbde5dIndexed text · page 7
Show all pagesSUMMARY The rate of stormwater runoff flowing toward the roadway under proposed conditions will be less than the existing. Also, the rate of runoff flowing off the rear of the site will be reduced. Resulting in an overall reduction in stormwater runoff leaving the site. Freq Pre- Post Routed (yrs) Developed | Developed | Outflow Runoff (cfs) (cfs) 2 0.36 1.24 0.34 10 0.86 2.00 0.63 100 1.68 3.14 1.45 Due to the stormwater management facilities to be constructed, development of the property will provide a reduction in the rate of stormwater runoff leaving the site. The reduced rate of runoff will have no negative impact on the adjacent property owners or on the downstream drainage facilities. Matarazzo Engineering 575 Route 46 West _ Fairfield, New Jersey 07004 Phone: (973) 808-8779 Fax: (973) 808-8789 RESPONSE TO OPRA 2024-53_ 000007
File revisions (1)
- Sep 29, 2026
232def4f084323,698,830 bytes