Supporting Documentation · Feb 12, 2025
EX Pool 8 Full Matarrazo Drainage System Approved by Town 3623
232def4f084312756cd593875015a95306c097a4d513494b51f90adfdecbde5dIndexed text · page 72
Show all pages4. Soil erosion and sediment control measures need to be provided on the plans including the area of disturbance for this project needs to be delineated and added to the plan; 5. Soil erosion and sediment control measures must be in place prior to initiating soil disturbance. The measures must also be maintained until the area of disturbance has been permanently stabilized; 6. The plan shows proposed walls that are 4.0 feet in height for which we defer to your office regarding details necessary for construction permits; 7. The plan does not indicate where the pool equipment is to be located and should be added to the plans. Applicant is advised that filter backwash is considered a pollutant in accordance with section 25-29.2 of the ordinance; 8. A perimeter fence with self-latching gate should be added/labeled on the plan. We defer to zoning regarding this item; 9. The proposed grading scheme should be maintained during construction to ensure runoff is not redirected onto the adjoining properties; 10. Upon completion of the project an as-built plan needs to be submitted and approved. Please contact me if you have any questions. Cc: Geniece Gary-Adams AN EQUAL OPPORTUNITY EMPLOYER www.westorange.org RESPONSE TO OPRA 2024-53_000072
File revisions (1)
- Sep 29, 2026
232def4f084323,698,830 bytes