Supporting Documentation · Apr 15, 2026
Stormwater Management Report 03302026
f21e274dca0e46b0f772672884e856d0c7ea7056c08892da2245c124f65038ddIndexed text
24-223 DRAINAGE DESIGN-PROPOSED-2026-03-30 NOAA 24-hr D 2-Year-2020 Rainfall=3.47", P2=3.47" Prepared by Jarmel Kizel Architects & Engnrs Printed 3/30/2026 HydroCAD® 10.20-6a s/n 12607 © 2024 HydroCAD Software Solutions LLC Page 19 Summary for Subcatchment P3C: P3C- Roof Area Runoff = 0.19 cfs @ 12.00 hrs, Volume= 1,214 cf, Depth= 3.24" Routed to Link P-DP 2 : PROP DP 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.50 hrs NOAA 24-hr D 2-Year-2020 Rainfall=3.47", P2=3.47" Area (sf) CN Description * 4,500 98 Roof and Amenity Area 4,500 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.9 52 0.0100 0.95 Sheet Flow, ROOF Smooth surfaces n= 0.011 P2= 3.47" 0.2 54 0.0216 5.51 1.92 Pipe Channel, 8 ROOF DRAIN 8.0" Round Area= 0.3 sf Perim= 2.1' r= 0.17' n= 0.012 1.1 106 Total
24-223 DRAINAGE DESIGN-PROPOSED-2026-03-30 NOAA 24-hr D 2-Year-2020 Rainfall=3.47", P2=3.47" Prepared by Jarmel Kizel Architects & Engnrs Printed 3/30/2026 HydroCAD® 10.20-6a s/n 12607 © 2024 HydroCAD Software Solutions LLC Page 20 Subcatchment P3C: P3C- Roof Area Hydrograph 0.21 Runoff 0.2 0.19 cfs 0.19 0.18 NOAA 24-hr D 0.17 2-Year-2020 Rainfall=3.47" 0.16 0.15 P2=3.47" 0.14 0.13 Runoff Area=4,500 sf 0.12 Runoff Volume=1,214 cf Flow (cfs) 0.11 0.1 Runoff Depth=3.24" 0.09 0.08 Flow Length=106' 0.07 Tc=1.1 min 0.06 0.05 CN=98 0.04 0.03 0.02 0.01 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours)
24-223 DRAINAGE DESIGN-PROPOSED-2026-03-30 NOAA 24-hr D 2-Year-2020 Rainfall=3.47", P2=3.47" Prepared by Jarmel Kizel Architects & Engnrs Printed 3/30/2026 HydroCAD® 10.20-6a s/n 12607 © 2024 HydroCAD Software Solutions LLC Page 21 Summary for Link 11L: Proposed Disturbed Inflow Area = 69,715 sf, 92.28% Impervious, Inflow Depth = 3.08" for 2-Year-2020 event Inflow = 2.79 cfs @ 12.01 hrs, Volume= 17,899 cf Primary = 2.79 cfs @ 12.01 hrs, Volume= 17,899 cf, Atten= 0%, Lag= 0.0 min Routed to Link P-DP 1 : PROP DP 1 Primary outflow = Inflow, Time Span= 0.00-30.00 hrs, dt= 0.50 hrs Link 11L: Proposed Disturbed Hydrograph Inflow 2.79 cfs Primary 3 2.79 cfs Inflow Area=69,715 sf 2 Flow (cfs) 1 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours)
24-223 DRAINAGE DESIGN-PROPOSED-2026-03-30 NOAA 24-hr D 2-Year-2020 Rainfall=3.47", P2=3.47" Prepared by Jarmel Kizel Architects & Engnrs Printed 3/30/2026 HydroCAD® 10.20-6a s/n 12607 © 2024 HydroCAD Software Solutions LLC Page 22 Summary for Link 15L: TOTAL PROPOSED Inflow Area = 133,103 sf, 56.94% Impervious, Inflow Depth = 2.30" for 2-Year-2020 event Inflow = 3.74 cfs @ 12.03 hrs, Volume= 25,487 cf Primary = 3.74 cfs @ 12.03 hrs, Volume= 25,487 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-30.00 hrs, dt= 0.50 hrs Link 15L: TOTAL PROPOSED Hydrograph Inflow 3.74 cfs Primary 4 3.74 cfs Inflow Area=133,103 sf 3 Flow (cfs) 2 1 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours)
24-223 DRAINAGE DESIGN-PROPOSED-2026-03-30 NOAA 24-hr D 2-Year-2020 Rainfall=3.47", P2=3.47" Prepared by Jarmel Kizel Architects & Engnrs Printed 3/30/2026 HydroCAD® 10.20-6a s/n 12607 © 2024 HydroCAD Software Solutions LLC Page 23 Summary for Link P-DP 1: PROP DP 1 Inflow Area = 115,774 sf, 57.23% Impervious, Inflow Depth = 2.29" for 2-Year-2020 event Inflow = 3.22 cfs @ 12.04 hrs, Volume= 22,126 cf Primary = 3.22 cfs @ 12.04 hrs, Volume= 22,126 cf, Atten= 0%, Lag= 0.0 min Routed to Link 15L : TOTAL PROPOSED Primary outflow = Inflow, Time Span= 0.00-30.00 hrs, dt= 0.50 hrs Link P-DP 1: PROP DP 1 Hydrograph Inflow 3.22 cfs Primary 3.22 cfs Inflow Area=115,774 sf 3 Flow (cfs) 2 1 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours)
24-223 DRAINAGE DESIGN-PROPOSED-2026-03-30 NOAA 24-hr D 2-Year-2020 Rainfall=3.47", P2=3.47" Prepared by Jarmel Kizel Architects & Engnrs Printed 3/30/2026 HydroCAD® 10.20-6a s/n 12607 © 2024 HydroCAD Software Solutions LLC Page 24 Summary for Link P-DP 2: PROP DP 2 Inflow Area = 17,329 sf, 54.94% Impervious, Inflow Depth = 2.33" for 2-Year-2020 event Inflow = 0.52 cfs @ 12.02 hrs, Volume= 3,361 cf Primary = 0.52 cfs @ 12.02 hrs, Volume= 3,361 cf, Atten= 0%, Lag= 0.0 min Routed to Link 15L : TOTAL PROPOSED Primary outflow = Inflow, Time Span= 0.00-30.00 hrs, dt= 0.50 hrs Link P-DP 2: PROP DP 2 Hydrograph Inflow 0.52 cfs Primary 0.55 0.52 cfs Inflow Area=17,329 sf 0.5 0.45 0.4 0.35 Flow (cfs) 0.3 0.25 0.2 0.15 0.1 0.05 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours)
24-223 DRAINAGE DESIGN-PROPOSED-2026-03-30 NOAA 24-hr D 10-Year-2020 Rainfall=5.38", P2=3.47" Prepared by Jarmel Kizel Architects & Engnrs Printed 3/30/2026 HydroCAD® 10.20-6a s/n 12607 © 2024 HydroCAD Software Solutions LLC Page 25 Summary for Subcatchment 1S: Roof Runoff = 2.63 cfs @ 12.01 hrs, Volume= 17,159 cf, Depth= 5.14" Routed to Link 11L : Proposed Disturbed Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.50 hrs NOAA 24-hr D 10-Year-2020 Rainfall=5.38", P2=3.47" Area (sf) CN Description * 40,040 98 Roof and Amenity Area 40,040 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.7 53 0.0200 1.26 Sheet Flow, ROOF Smooth surfaces n= 0.011 P2= 3.47" 0.5 196 0.0200 6.95 5.46 Pipe Channel, 12 ROOF DRAIN 12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25' n= 0.012 0.3 217 0.0424 11.74 14.41 Pipe Channel, 15 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.012 1.5 466 Total
24-223 DRAINAGE DESIGN-PROPOSED-2026-03-30 NOAA 24-hr D 10-Year-2020 Rainfall=5.38", P2=3.47" Prepared by Jarmel Kizel Architects & Engnrs Printed 3/30/2026 HydroCAD® 10.20-6a s/n 12607 © 2024 HydroCAD Software Solutions LLC Page 26 Subcatchment 1S: Roof Hydrograph Runoff 2.63 cfs NOAA 24-hr D 10-Year-2020 Rainfall=5.38" P2=3.47" 2 Runoff Area=40,040 sf Runoff Volume=17,159 cf Flow (cfs) Runoff Depth=5.14" Flow Length=466' 1 Tc=1.5 min CN=98 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours)
24-223 DRAINAGE DESIGN-PROPOSED-2026-03-30 NOAA 24-hr D 10-Year-2020 Rainfall=5.38", P2=3.47" Prepared by Jarmel Kizel Architects & Engnrs Printed 3/30/2026 HydroCAD® 10.20-6a s/n 12607 © 2024 HydroCAD Software Solutions LLC Page 27 Summary for Subcatchment P1-I: P1 IMPERVIOUS PARKING Runoff = 1.59 cfs @ 12.01 hrs, Volume= 10,412 cf, Depth= 5.14" Routed to Link 11L : Proposed Disturbed Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.50 hrs NOAA 24-hr D 10-Year-2020 Rainfall=5.38", P2=3.47" Area (sf) CN Description * 24,295 98 Uncovered Paved parking, HSG C 24,295 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.5 100 0.0150 1.12 Sheet Flow, sheet flow Parking area n= 0.013 P2= 3.47" 0.9 127 0.0150 2.49 Shallow Concentrated Flow, parking area Paved Kv= 20.3 fps 0.3 198 0.0449 12.08 14.83 Pipe Channel, Pipe flow 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.012 2.7 425 Total
24-223 DRAINAGE DESIGN-PROPOSED-2026-03-30 NOAA 24-hr D 10-Year-2020 Rainfall=5.38", P2=3.47" Prepared by Jarmel Kizel Architects & Engnrs Printed 3/30/2026 HydroCAD® 10.20-6a s/n 12607 © 2024 HydroCAD Software Solutions LLC Page 28 Subcatchment P1-I: P1 IMPERVIOUS PARKING Hydrograph Runoff 1.59 cfs NOAA 24-hr D 10-Year-2020 Rainfall=5.38" P2=3.47" Runoff Area=24,295 sf Runoff Volume=10,412 cf Flow (cfs) 1 Runoff Depth=5.14" Flow Length=425' Tc=2.7 min CN=98 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours)
File revisions (1)
- Sep 29, 2026
f21e274dca0e9,397,997 bytes