Supporting Documentation · May 28, 2026
2026 05 Storm Water Management Report rcd 5 6 2026
ca1b6a05d93acd17db8ba3736caf854fbeada41956eb0ec8f599e95e0e23a985Indexed text · page 138
Show all pagesPhotograph 7 (Top left): TP-05: 10 inches of asphalt underlain by gravel. Wires, large gravel, cobble, and brick encountered between 1.0 and 3.0 feet below ground surface. Photograph 8 (Top right): TP-05: Reddish brown Silt and Sand Loam encountered between 3.0 and 9.0 feet-below ground surface. Photograph 9 (Bottom left): TP-05: Fill encountered. Mavis #2296 – Additional Infiltration Testing SELECT PROJECT PHOTOGRAPHS 460 Prospect Avenue West Orange, NJ ECS Project 44:2100-A January 23, 2025 Mavis Tire Supply, LLC
File revisions (1)
- Sep 29, 2026
ca1b6a05d93a18,504,890 bytes