Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · May 28, 2026

2026 05 Storm Water Management Report rcd 5 6 2026

Preserved file SHA-256ca1b6a05d93acd17db8ba3736caf854fbeada41956eb0ec8f599e95e0e23a985

Indexed text · page 147

Show all pages
Page 147

PROPOSED DRAINAGE AREA #1 (ADDITIONAL AREA TO ONSITE CONVEYANCE) POI #1 POI #3 D POI #2 LEGEND E C C PERVIOUS SURFACE TC PATH C PROPOSED DRAINAGE AREA #1 IMPERVIOUS SURFACE TC PATH (BIORETENTION BASIN) PROPOSED DRAINAGE AREA #1 IMPERVIOUS AREA = 0.078 AC. (CN = 98; TC = 0.5 MINUTES) (ROOF AREA) PERVIOUS AREA =

Page 147

ED DRAINAGE AREA #1 IMPERVIOUS AREA = 0.078 AC. (CN = 98; TC = 0.5 MINUTES) (ROOF AREA) PERVIOUS AREA = 0.068 AC. (CN = 80; TC = 5.1 MINUTES) C IMPERVIOUS AREA = 0.142 AC. TOTAL AREA = 0.146 AC. (CN = 98; TC = 1.0 MINUTE) D B A C C PROPOSED DRAINAGE AREA #3 PROPOSED DRAINAGE AREA #2 (SHEET FLOW TO NORTHEAST) B PERVIOUS AREA = 0.081 AC. (CN = 80; TC = 8.5 MINUTES) (UNCONTROLLED TO R.O.W.) IMPERVIOUS AREA = 0.017 AC. (CN = 98; TC = 0.8 MINUTES) B TOTAL AREA = 0.076 AC. A PERVIOUS AREA = 0.025 AC. (CN = 80; TC = 3.5 MINUTES) B TOTAL AREA = 0.042 AC.

Page 147

CN = 80; TC = 3.5 MINUTES) B TOTAL AREA = 0.042 AC. B A B PROPOSED DRAINAGE AREA #1 (TO ON-SITE CONVEYANCE) A A IMPERVIOUS AREA = 0.204 AC. D A (CN = 98; TC = 2.0 MINUTES) A PERVIOUS AREA = 0.071 AC. (CN = 80; TC = 5.0 MINUTES) C TOTAL AREA = 0.275 AC. A 5 Greentree Centre, Suite 406

Page 147

5 Greentree Centre, Suite 406 Marlton, NJ 08053 T: 856.334.2000 F: 732.974.3521 www.dynamicec.com ● PERMITTING ● LAND DEVELOPMENT CONSULTING GEOTECHNICAL ● ENVIRONMENTAL ● SURVEY ● PLANNING &

Page 147

LAND DEVELOPMENT CONSULTING GEOTECHNICAL ● ENVIRONMENTAL ● SURVEY ● PLANNING & ZONING Offices conveniently located throughout the United States: New Jersey | Delaware | Florida | Maryland | Pennsylvania | Texas PROPOSED DRAINAGE AREA MAP Y D H RODMAN R. RITCHIEROBERT P. FREUD 2 2 ã

File revisions (1)