STORAGE 4. ALL SIMPSON STRONG-TIES TO BE INSTALLED FLUSHED WITH FLOOR JOISTS LAUNDRY UNLESS OTHERWISE NOTED. BATH 5. FINAL UTILITY EQUIPMENT CONFIGURATION, PLUMBING, DUCT, ELECTRICAL,
ETC., LOCATIONS TO BE DETERMINED BY CONTRACTOR AND THE OWNER. ALL DRAWINGS AND WRITTEN MATERIALS APPEARING HEREIN SISTER EXIST. 6. LOCATE HVAC GRILLS AND DIFFUSERS ON CENTER OF WINDOW, DOOR, CONSTITUTE ORIGINAL AND
UNPUBLISHED WORK OF THE JOIST W/ MINOR OPENING OR ROOM. COORDINATE WITH HVAC CONTRACTOR. ARCHITECT. THE REPRODUCTION CRACK (V.I.F.) OF THIS DRAWING FOR THE 7. INSTALL BLANKET INSULATION IN WALL CAVITY AROUND ALL. PURPOSE OF COPYING THIS
7. INSTALL BLANKET INSULATION IN WALL CAVITY AROUND ALL. PURPOSE OF COPYING THIS WORK OR REVISING SAID DRAWING SHALL MECH. CONTRACTOR TO LEVEL BE CONSIDERED A VIOLATION OF EXIST. CONC. SLAB W/ BOTH THE PROFESSIONAL CODE OF
BOTH THE PROFESSIONAL CODE OF ETHICS AND A THEFT OF COMPANY SELF-LEVELING UNDERLAYMENT ASSETS, BOTH OF WHICH SHALL BE FINISH W/ EPOXY SHIELD PROSECUTED TO THE FULLEST
EXTENT OF THE LAW AND CURRENT ENTIRE GARAGE FLOOR 2x10 FLOOR JOIST @ 16" O.C. STATUTES. MATCH FLOOR FRAMING HGT.
Consultant: Aaron Gonzales, PhD 5 OF EXISTING RESIDENCE 28'-11" NO CHANGES IN THE HATCHED AREA FIRST FLOOR
0" FINISH BASEMENT WATERPROOFING VAPOR BARRIER, 4' ELECTRIC 1/2" GYP. BD.
1/2" GYP. BD. CEILING 10 MIL. MIN. BASEBOARD FULL HEIGHT HEATER. EXACT NEW BASEMENT LOCATIONS TO WALL BE VERIFIED W/ OWNER &
BE VERIFIED W/ OWNER & ELECTRICIAN 7'-5" 7'-4" STORAGE 12" CMU FOUNDATION WALL
File revisions (1)
- Sep 29, 2026
b4fb2ab8971c19,301,938 bytes