ARCHITECT OF RECORD: FC3 ARCHITECTURE+DESIGN, LLC NJ CERT. OF AUTHORIZ. #AC-58100 22'-3" 12" CMU CORE-FILLED WALL SCHEDULE FOUNDATION WALL

Page 5

FOUNDATION WALL 4'-0" 18'-3" W/ 1-#4 VERT. REBAR EXISTING WALL CONSTRUCTION. TYP. 2x4 WOOD CONSTRUCTION (V.I.F.) 4' O.C. 2' FROM EDGE ON A 2' x 1' CONT. NEW INTERIOR 2x4 WOOD STUD PARTITION @ 16" O.C. W/ ONE LAYER 1/2" 36x18 SLIDER CONC. FOOTING

Page 5

(MIN. 3500 PSI) W/ PROPOSED BASEMENT LEVEL SQUARE FOOT: GYP. BD. EACH SIDE. USE WATER RESISTANT GYP. BD. AT ALL WET AREAS USE CEMENTITIOUS BACKER BD. AT ALL SHOWERS / TUBS. 2-#4 REBAR HORIZ. 1. 22'-3" x 9'-0" = 200 S.F. GFI GFI GFI REFER TO SECTION

Page 5

GFI REFER TO SECTION NO. 3 THIS PAGE NEW EXTERIOR WALL CONSTRUCTION: 8" CMU, CORE-FILLED BASEMENT WALL 2x10 FLOOR JOISTS 2x10 FLOOR JOISTS FRANK CUNHA III, AIA, NCARB @ 16" O.C.

Page 5

O.C. REGISTERED ARCHITECT CRAWL SPACE NEW JERSEY #16411 @ 16" GFI 9'-0"

Page 5

9'-0" NEW ADDITION 3 FC3 PROJECT NO. 26-NJ-052 W8x13 W/ 2 A-100 HSS 4x4x1/4 HSS 4x4x1/4 COLUMN / POST NOTE: GENERAL FOUNDATION NOTES: 6 ON 1'x1'x1' FOOTING 1. POSTS

Page 5

ON 1'x1'x1' FOOTING 1. POSTS FOR "ONCENTER" STEEL BEAM TO BE SOLID THRU TO REST GFI ON SOLID CONCRETE FOUNDATION, STL. COLUMN OR POST BELOW. 1. ALL EXTERIOR DIMENSIONS MEASURED TO OUTSIDE FACE OF CMU WALL, INSTALLED IN ACCORDANCE W/ MANUFACTURERS SPECIFICATION. ALL INTERIOR DIMENSIONS MEASURED TO INTERIOR FACE OF CMU, ALL EXIST. GARAGE VERTICAL DIMENSIONS ARE TAKEN TO TOP OF

Page 5

VERTICAL DIMENSIONS ARE TAKEN TO TOP OF GROUND. 2. ALL DIMENSIONS TO BE VERIFIED IN FIELD. 2'-4" 10'-0" 2'-4" 3. FINAL STRUCTURAL DESIGN TO BE REVIEWED AND APPROVED BY LICENSED NEW EX. FAN 14'-7 1/2" STRUCTURAL ENGINEER. VENT THRU

Page 5

STRUCTURAL ENGINEER. VENT THRU STORAGE 4. ALL SIMPSON STRONG-TIES TO BE INSTALLED FLUSHED WITH FLOOR JOISTS LAUNDRY UNLESS OTHERWISE NOTED. BATH 5. FINAL UTILITY EQUIPMENT CONFIGURATION, PLUMBING, DUCT, ELECTRICAL,

Page 5

, ETC., LOCATIONS TO BE DETERMINED BY CONTRACTOR AND THE OWNER. ALL DRAWINGS AND WRITTEN MATERIALS APPEARING HEREIN SISTER EXIST. 6. LOCATE HVAC GRILLS AND DIFFUSERS ON CENTER OF WINDOW, DOOR, CONSTITUTE ORIGINAL AND