Supporting Documentation · Sep 17, 2026
13 Porter Site Plan Updated rcd 9 1 2026
a7ea227b5d4555256863aac631ac21a39f36c64ef9e9ecd06a4ffba16a6cc40dIndexed text · page 5
Show all pagesUNPUBLISHED WORK OF THE JOIST W/ MINOR OPENING OR ROOM. COORDINATE WITH HVAC CONTRACTOR. ARCHITECT. THE REPRODUCTION CRACK (V.I.F.) OF THIS DRAWING FOR THE
7. INSTALL BLANKET INSULATION IN WALL CAVITY AROUND ALL. PURPOSE OF COPYING THIS WORK OR REVISING SAID DRAWING SHALL MECH. CONTRACTOR TO LEVEL BE CONSIDERED A VIOLATION OF EXIST. CONC. SLAB W/
BOTH THE PROFESSIONAL CODE OF ETHICS AND A THEFT OF COMPANY SELF-LEVELING UNDERLAYMENT ASSETS, BOTH OF WHICH SHALL BE FINISH W/ EPOXY SHIELD
PROSECUTED TO THE FULLEST EXTENT OF THE LAW AND CURRENT ENTIRE GARAGE FLOOR 2x10 FLOOR JOIST @ 16" O.C. STATUTES. MATCH FLOOR FRAMING HGT.
MATCH FLOOR FRAMING HGT. Consultant: Aaron Gonzales, PhD 5 OF EXISTING RESIDENCE 28'-11" NO CHANGES IN THE HATCHED AREA
FIRST FLOOR 0" FINISH BASEMENT WATERPROOFING VAPOR BARRIER, 4'
VAPOR BARRIER, 4' ELECTRIC 1/2" GYP. BD. CEILING 10 MIL. MIN. BASEBOARD FULL HEIGHT HEATER. EXACT NEW BASEMENT LOCATIONS TO
WALL BE VERIFIED W/ OWNER & ELECTRICIAN 7'-5" 7'-4" GARAGE 12" CMU FOUNDATION WALL
12" CMU FOUNDATION WALL SMOOTH PARGE FINISH. REV. # SITS ON A 2'x1' CONT. CONC.
4'-6" FOOTING (MIN. 3500PSI) W/ (2) #4 REBAR HORIZ. 8'-8" BELOW GRADE.
File revisions (1)
- Sep 29, 2026
a7ea227b5d456,398,369 bytes