Supporting Documentation · Sep 20, 2022

241-22 Attachment.pdf

Preserved file SHA-256dcac739b8fee02d6da6ab0ca8ab4564bf77dcde3a28be3fc4501affb21973105

Indexed text

Page 1

WAIA Change Order 241-22 Document G701" - 2017 PROJECT: (Name and address) West Orange Public Library 10 Rooney Circle West Orange, NJ 07052 OWNER: (Name and address) Township of West Orange 66 Main Street West Orange, NJ. 07052 CONTRACT INFORMATION: Contract For: General Construction Date: ARCHITECT: (Name ane address) Arcari + Iovino Architects, P.C. One Katherine Street Little Ferry, NJ 07643 CHANGE ORDER INFORMATION: Change Order Number: 003 Date: September 7, 2022 CONTRACTOR: (Name and address) H&S Construction and Mechanical, Inc. 721 Bayway Avenue Elizabeth, NJ. 07202 THE CONTRACT IS CHANGED AS FOLLOWS: Masert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) Drywall & framing repair at mold areas (COR #5). Add $14,013.60 The original Contract Sum was ‘The net change by previously authorized Change Orders ‘The Contract Sum prior to this Change Order was The Contract Sum will be increased by this Change Order in the amount of ‘The new Contract Sum including this Change Order will be ‘The Contract Time will be unchanged by Zero (0) days. $ 5,075,000.00 $ 32,313.20 $ 5,107,313.20 $ $ 14,013.60 5,121,326.80 The new date of Substantial Completion will be NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. ITIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Architects, P.C. H&S Construction and Mechanical, Inc. ‘Township of West Orange i firm name) CONTRACTOR (Firin name) OWNER (Firm name) 2 SIGNATUR SIGNATURE SIGNATURE Anthony Tovino, President Daniel Hemandez, President JOHN O. GROSS, BA/CFO PRINTEQNAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE u/ oY, 203..— Dat DATE DATE AlA Document G701™ ~ 2017. Copyright © 1979, 1987, 2000 , 2001 and 2017 by The American Institute of Archilects, Al rights reserved, The "Armorican Insilite of Architacts. ‘AIA the AIA Logo. and "AIA Contract Documers’ are registered trademarks and may nol be used withoul permission This dacament was produced

Page 1

s, Al rights reserved, The "Armorican Insilite of Architacts. ‘AIA the AIA Logo. and "AIA Contract Documers’ are registered trademarks and may nol be used withoul permission This dacament was produced by AIA software at 16:22:33 ET on 09/07/2022 under Order No.2114292317 which expires on 02/22/2023, is not for resale. is licensed for one. ime Use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations. e-mail ‘copyright@aia.org. User Notes: (@B9ADAA8) 1

Page 2

Construction e£ Mechanical, Inc. eral Contractors Sprinkler CHANGE ORDER REQUEST Project: West Orange Public Library To Contractor: H&S Construction & Mechanical inc. 721 Bayway Ave Elizabeth Ni 07202 The Contract is changed as follows: Tumbing “Heating Design Owner: Township of West Orange Construction Mage: Architect: Arcari & lovino Contractor: H&S Construction Field: corns: Initiation date: | Project No: 22-044 Contract For: Completion Contract Contract Date: Repair framing and drywall at mold removed areas | ear Description ‘Company Totals Repair framing and patch drywal (s¢2 praposal err z as attached) 2 3 ‘ | Subcontractor Subtotal S 12,037.56 HES- Overhead & Profit sub cost $ 50188 | Sub Contractors Total 5 22,633.44 tern Description Company Totals 5 [PM Time S.hrs @150per hr was s #4000 ‘ Has j 7 was i a Has ° has wo a Contractor Subtotal § 840.00 HAS Overhead & Profit 15% of CantractorCost_$ 126.00 Contractors Tatal_§ 966.00 SubTotal _§ 23,605.44 HBS Band Cost ”§ 408.16 Total $ 1413.60, ‘The contract time will be increased by: 7 days

Page 3

COMPANY: PROJECT: Description: & DESIGN LLC. PO BOX 7016, East Brunswick NJ 08816 732-907-9717 Proposed Change order # Date: HQ CONSTRUCTION a PROPOSED CHANGE ORDER 7 9/6/2022 H&S Construction ATTN: Pat Blandino West Orange Library REQUESTED BY: Architect Ticket # Job # 22-044 PO# 22-270 Remove and replace approximately 195 LF of Framing and install new drywall Framing remove and re-frame existing area 2 Carpenters 2 Days 32 Hours Carp Install Drywall 1 Carp Foreman and 1 Carp 1 1/2 Days 24 Hours Carp 1 Drywall finisher to finish drywall 2 1/2 Days 20 Hours Drywall finisher ] Painter to Prime 8 hours 8 Hours Painter Materials: Metal studs 101 14.48 $1,462.48 Drywall 22 22.58 $496.76 Misc Tape Spackle Screws $458.97 Paint $54.87 LABOR: Total materials cost: $2,473.08 Classification Hours Rate Sub Total Laborer 0 $84.57 0 Laborer For 0 $90.32 0 Carp 56 106.81 5981.36 Carp For 0 $122.72 0 Drywall finish 20 $88.60 1772 Rodman 0 $119.12 0 Mason for 0 $108.90 0 Mason 0 $101.34 0 Painter For 0 $95.12 0 Painter 8 $89.60 716.8 Total labor cost: $8,470.16 Subtotal $10,943.24 Profit & Overehad 10% $1,094.32 Total change to contract: $12,037.56 Approved by: Signature: