Construction e£ Mechanical, Inc. eral Contractors Sprinkler CHANGE ORDER REQUEST Project: West Orange Public Library To Contractor: H&S Construction & Mechanical inc. 721 Bayway Ave Elizabeth Ni 07202 The Contract is changed as follows: Tumbing “Heating Design Owner: Township of West Orange Construction Mage: Architect: Arcari & lovino Contractor: H&S Construction Field: corns: Initiation date: | Project No: 22-044 Contract For: Completion Contract Contract Date: Repair framing and drywall at mold removed areas | ear Description ‘Company Totals Repair framing and patch drywal (s¢2 praposal err z as attached) 2 3 ‘ | Subcontractor Subtotal S 12,037.56 HES- Overhead & Profit sub cost $ 50188 | Sub Contractors Total 5 22,633.44 tern Description Company Totals 5 [PM Time S.hrs @150per hr was s #4000 ‘ Has j 7 was i a Has ° has wo a Contractor Subtotal § 840.00 HAS Overhead & Profit 15% of CantractorCost_$ 126.00 Contractors Tatal_§ 966.00 SubTotal _§ 23,605.44 HBS Band Cost ”§ 408.16 Total $ 1413.60, ‘The contract time will be increased by: 7 days

File revisions (1)