Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Sep 20, 2022

241-22 Attachment.pdf

Preserved file SHA-256dcac739b8fee02d6da6ab0ca8ab4564bf77dcde3a28be3fc4501affb21973105

Indexed text · page 3

Show all pages
Page 3

COMPANY: PROJECT: Description: & DESIGN LLC. PO BOX 7016, East Brunswick NJ 08816 732-907-9717 Proposed Change order # Date: HQ CONSTRUCTION a PROPOSED CHANGE ORDER 7 9/6/2022 H&S Construction ATTN: Pat Blandino West Orange Library REQUESTED BY: Architect Ticket # Job # 22-044 PO# 22-270 Remove and replace approximately 195 LF of Framing and install new drywall Framing remove and re-frame existing area 2 Carpenters 2 Days 32 Hours Carp Install Drywall 1 Carp Foreman and 1 Carp 1 1/2 Days 24 Hours Carp 1 Drywall finisher to finish drywall 2 1/2 Days 20 Hours Drywall finisher ] Painter to Prime 8 hours 8 Hours Painter Materials: Metal studs 101 14.48 $1,462.48 Drywall 22 22.58 $496.76 Misc Tape Spackle Screws $458.97 Paint $54.87 LABOR: Total materials cost: $2,473.08 Classification Hours Rate Sub Total Laborer 0 $84.57 0 Laborer For 0 $90.32 0 Carp 56 106.81 5981.36 Carp For 0 $122.72 0 Drywall finish 20 $88.60 1772 Rodman 0 $119.12 0 Mason for 0 $108.90 0 Mason 0 $101.34 0 Painter For 0 $95.12 0 Painter 8 $89.60 716.8 Total labor cost: $8,470.16 Subtotal $10,943.24 Profit & Overehad 10% $1,094.32 Total change to contract: $12,037.56 Approved by: Signature:

File revisions (1)