Supporting Documentation · Jan 10, 2023
13-23 Attachment - Change Order 8.pdf
905a7d893af4fdfb47fab0a855bf4a33cba9beacfbb33ab5a40efc7c918aa57fIndexed text · page 3
Show all pagesHQ CONSTRUCTION & DESIGN LLC. PO BOX 7016, East Brunswick NJ 08816 732-907-9717 PROPOSED CHANGE ORDER Proposed Change order # 10 Date: 11/22/2022 COMPANY: H&S Construction ATTN: Pat Blandino PROJECT: West Orange Library REQUESTED BY: Architect Description: Ticket # Cut concrete for the electrician in 6 locations only we did not include any other items in this change order Based on drawing by SK.6B Lower level Device Location plan 2 Laborers 2 Days to saw cut remove concrete and then Dowl and repour concrete Materials: Disposal 0 0 $50.00 Rebar $34.00 Saw rental 2 189.78 $379.56 Jack hammer rental 2 248.98 $497.96 $0.00 LABOR: Total materials cost: $961.52 Classification Hours Rate Sub Total Laborer 16 $84.57 1353.12 Laborer For 16 $90.32 1445.12 Carp 0 106.81 0 Carp For 0 $122.72 0 Operator 0 $115.76 0 Rodman 0 $119.12 0 Mason for 0 $108.90 0 Mason 0 $101.35 0 Drywawll Fin 0 $95.00 0 Painter 0 $89.60 0 Total labor cost:
0 $95.00 0 Painter 0 $89.60 0 Total labor cost: $2,798.24 Subtotal $3,759.76 Profit & Overehad 10% $375.98 Total change to contract: $4,135.74 Approved by: Signature:
File revisions (1)
- Sep 29, 2026
905a7d893af4442,990 bytes