Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Feb 13, 2024

67-24 NEGLIA West Orange Walker Road Final 2024.pdf

Preserved file SHA-256b28d73feb11896654c1481dbfe3dcb18eeb57676291f317ed196d2be1293a8da

Indexed text · page 14

Show all pages
Page 14

Scope of Services The scope of work for this contract shall include all work required for the preparation of plans and specifications for the project “LTPF FY 2023 NJDOT LOCAL TRANSPORTATION PROJECT FUNDS WALKER ROAD (FROM GREGORY AVE TO S. VALLEY RD), S. VALLEY RD (FROM WALKER RD. TO TWP. LINE WITH S. ORANGE) AND ROONEY CIRCLE.” The successful engineering firm for this project shall be expected to provide the following services: 1. Land Surveying Services: A. Topographic Survey and Base Mapping that will provide a topographic field survey and base mapping suitable for the proposed improvements, which will include, but will not be limited to, the following items: 1. Establishment of centerline of existing street. 2. Topographic survey of all trees, shrubs, walls, driveways, walks, steps, and other existing features within the ROW and farther where necessary to the proposed improvements. 3. Right of way will be shown from available Township Tax Map information. 4. Topographic Survey including additional topography behind the curb and sidewalk of the roadways and at road intersections; 5. Top and Bottom of curb elevations, storm inlets with inverts and pipe sizes, sanitary manholes with rim elevations, and any other utilities visible on the roadways will need to be located; B. Establish horizontal control based on North American Datum 1983 (New Jersey State Plane Coordinate System-NAD 83) and North American Vertical Datum 1988 (NAVD 88); C. Benchmark(s) to be set on site for future use; D. Existing conditions/Survey Control plan; E. Coordinate utility mark-outs; As part of the deliverables, an electronic AutoCAD file of the Boundary and Topographic Survey is to be provided as part of the deliverables to our division. 2. Civil Engineering Services: A. Proposed roadway profiles matching existing grades; B. Roadway improvements include curb, sidewalk, aprons, pavement milling and resurfacing, pavement striping, new traffic signs, shade trees; C. Curb ramp plans and details as necessary; D. New

Page 14

curb, sidewalk, aprons, pavement milling and resurfacing, pavement striping, new traffic signs, shade trees; C. Curb ramp plans and details as necessary; D. New drainage improvements as necessary; E. Drainage structure repairs with new frames, grates, curb pieces as necessary; F. New manhole castings, frames and covers, as necessary. Repair existing manholes as necessary; RFP- WALKER ROAD, S VALLEY ROAD AND ROONEY CIRCLE WEST ORANGE Page | 13

File revisions (1)