Supporting Documentation · Feb 13, 2024
67-24 NEGLIA West Orange Walker Road Final 2024.pdf
b28d73feb11896654c1481dbfe3dcb18eeb57676291f317ed196d2be1293a8daIndexed text · page 18
Show all pagesRATE SHEET Township of West Orange Walker Road, S. Valley Road and Rooney Circle Construction Administration and Inspection Neglia Group Township of West Orange 2024 Road Project Walker Road, S. Valley Road and Rooney Circle Project Cost Summary Design, CM & Cores Neglia Group Task Lump Sum Land Surveying Services* $ 9,600.00 Civil Engineering Services $ 13,200.00 LTPF FY 2023 PMRS Coordination $ 1,200.00 Bid Phase Services $ 1,500.00 Design Services During Con $ 2,700.00 Plan Reproduction $ 600.00 Design Total (Lump Sum) (45 Calendar Days) $ 28,800.00 Construction Administration (90 Calendar Days )** $ 23,400.00 Material Testing (Pavement Cores)*** $ 7,200.00 Project Total $ 59,400.00 *Right of way to be represented through the utlization of existing Tax Maps. The use of Tax Maps may not support a boundary survey Deliverable **Please separate CM proposal ***Coring and Testing Consultant to be approved Township vendor RFP- WALKER ROAD, S VALLEY ROAD AND ROONEY CIRCLE WEST ORANGE Page | 17
File revisions (1)
- Sep 29, 2026
b28d73feb1186,532,068 bytes