Supporting Documentation · Feb 13, 2024
67-24 NEGLIA West Orange Walker Road Final 2024.pdf
b28d73feb11896654c1481dbfe3dcb18eeb57676291f317ed196d2be1293a8daIndexed text · page 28
Show all pagesPATRICK J. CARBERRY, P.E., P.P., C.M.E., Project Manager Mr. Carberry has forty-four (44) years of experience in the fields of environmental and civil engineering. He has been responsible for the preparation of plans, specifications and design for various water, wastewater, and municipal projects. In addition, he has also prepared engineering studies. Mr. Carberry has served as a client representative to municipal water and sewer committees and has served as a Planning and Zoning Board of Adjustment Engineer. Featured projects are: Design of numerous water distribution, pumping stations and storage facilities, including a project with a 1,200-gpm booster pumping station, two reservoirs and a SCADA system with an estimated cost of $3.2M. Design of several wastewater treatment plants including a $75 million secondary wastewater treatment facility, and a $55 million solids-waste resource facility. Design of pretreatment facilities, including a pilot study for a state-of-the-art industrial pretreatment facility utilizing, and ultrafiltration treatment process on an industrial wastewater stream. Design of numerous sewage and stormwater pumping stations, including a 32,000-gpm stormwater pumping station in Bergen County. Developed water master plan for several municipalities in New Jersey. Responsible for numerous engineering studies and basis of design reports, as well as regulatory compliance for municipal water and wastewater systems. Professional Qualifications and Associations: New Jersey and New York Professional Engineer New Jersey Professional Planner New Jersey Certified Municipal Engineer Life Member of the American Water Works Association Member of the Water Environment Federation Member of the New Jersey Society of Municipal Engineers Mr. Carberry has received recognition from the American Consulting Engineering Council as a 1998 National Finalist in the Engineering Excellence Award Competition for the project entitled, Removing Heavy Metals by Ultrafiltration. YASSEEN SAAD, P.E., Project Manager Mr. Saad joined the Neglia Group in November 2021 and brings with him over six (6) years of experience in public/private projects. Manages municipal engineering on behalf of the Borough of Norwood, NJ, coordinating with the Planning and Zoning Boards and the Mayor and Council to perform engineering designs,
blic/private projects. Manages municipal engineering on behalf of the Borough of Norwood, NJ, coordinating with the Planning and Zoning Boards and the Mayor and Council to perform engineering designs, obtain applicable grants and permits, review board applications, generate preliminary cost estimates, and conduct the competitive bidding process. Mr. Saad is involved with Design/regulatory permitting, Roadway construction design, Water main/force main construction, Athletic fields, Pump station design, Sanitary sewer design, Stormwater management design, Municipal planning / zoning reviews, NJDEP land use permitting and all Grant applications. Featured projects are: Sandford Avenue Pump Station and Sanitary Sewer Improvements, Kearny, New Jersey Fish House Road & Pennsylvania Avenue Water Main Reconstruction, Kearny, New Jersey RFP- WALKER ROAD, S VALLEY ROAD AND ROONEY CIRCLE WEST ORANGE Page | 27
File revisions (1)
- Sep 29, 2026
b28d73feb1186,532,068 bytes