Supporting Documentation · Feb 13, 2024
67-24 NEGLIA West Orange Walker Road Final 2024.pdf
b28d73feb11896654c1481dbfe3dcb18eeb57676291f317ed196d2be1293a8daIndexed text · page 36
Show all pagesworkflows of projects involving this data, most recently in the Utilities and Tax sectors, and the improvement of data functionality and visibility for public and private clients. Featured projects are: Field collection and maintaining of datasets of Bergen County Utilities Authority (BCUA) sewer infrastructure throughout forty-seven (47) Bergen County municipalities. Data management and overseeing of Water Main Replacement and Lead Service Line Replacement programs with Veolia North America (Formerly Suez North America). Mapping of zoning districts for the eighty-eight (88) municipalities within the New Jersey Highlands Council authority, spanning six (6) counties. Manage the creation of new digital tax maps for various municipalities across New Jersey and construction of GIS parcels for ease of data updating and altering. Education: Bachelor of Science-Mechanical Engineering P.C. Rossin College of Engineering and Applied Science, Lehigh University, Bethlehem, PA Professional Qualifications and Associations: New Jersey Geospatial Forum Mid-Atlantic Chapter of the Urban and Regional Information Systems Association (MAC URISA) JOHN LOPRESTI, Crew Chief Mr. LoPresti joined the Neglia Group in 2018 and brings with him over twenty-two (22) years of surveying experience both in New Jersey and in the State of Washington. Mr. LoPresti was employed by Langan Engineering in the past few years. His vast knowledge of surveying instruments, data collection, and survey grade GPS equipment has set him apart from his peers and he uses this knowledge to manage and mentor his fellow survey team members. Mr. LoPresti has attended many continuing education courses in order to increase his knowledge and remain at the forefront of technology. He also keeps a 40 OSHA Certification and encourages others to work safely on a daily basis. Mr. LoPresti passed Level 1 of the Certified Surveying Technician (CST) test in Winter 2020. CONSTRUCTION DEPARTMENT JASON R. MENZELLA, Director of Construction As Director of Construction for the Neglia Group, Mr. Menzella oversees day-to-day construction administration operations. His twenty years of experience includes a wide array of construction projects involving roadway reconstruction, construction of ADA curb ramps, asphalt milling and paving, sanitary and storm signals, bridge construction,
experience includes a wide array of construction projects involving roadway reconstruction, construction of ADA curb ramps, asphalt milling and paving, sanitary and storm signals, bridge construction, athletic fields (synthetic and grass), playgrounds, steam cleanings, utility relocations and all levels of maintenance and protection of traffic. His experience also includes overseeing projects with water mains ranging from 8” main replacement to 15”, as well as emergency repairs on 30” mains. Featured projects are: Town of Kearny, Ivy Street Water Main Improvements – Chief Inspector. Project included the installation of an 8-inch watermain 1000 L.F. Project involved 125 one-inch water services, including milling, paving, and four fire hydrants. RFP- WALKER ROAD, S VALLEY ROAD AND ROONEY CIRCLE WEST ORANGE Page | 35
File revisions (1)
- Sep 29, 2026
b28d73feb1186,532,068 bytes