Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Feb 13, 2024

67-24 NEGLIA West Orange Walker Road Final 2024.pdf

Preserved file SHA-256b28d73feb11896654c1481dbfe3dcb18eeb57676291f317ed196d2be1293a8da

Indexed text · page 61

Show all pages
Page 61

PROJECT SUMMARY Green Street and Wesley Street Intersection Township of South Hackensack, New Jersey The Township of South Hackensack selected the Neglia Group to provide engineering services for the intersection and roadway improvements at the intersection of Green Street and Wesley Street. The intersection processes traffic from/ to Route 80, local traffic, and commercial traffic. Services provided for this project included roadway mill and pavement, traffic signal improvements, curb and ADA-ramp installation, and traffic striping. Neglia also prepared a Local Traffic Signal Plan in compliance with the NJDOT, MUTCD (Manual on Uniform Traffic Control Devices), AASHTO (American Association of State Highway and Transportation Officials), and County regulations and standards. Construction Management services were provided for the associated paving on Wesley Street. Project at a Glance Client: The Township of South Hackensack Contact: Donna Gambutti, RMC 201-440-1815 ext. 104 Location: South Hackensack, NJ Bergen County Services Provided: Traffic Engineering Design Engineering Survey Construction Management Bid Coordination Completion: November 2017 Construction Value: $450,000

File revisions (1)