Supporting Documentation · Feb 13, 2024
67-24 GPI - FULL SUBM LTPF FY 2023_Walker S. Valley Rooney 02-02-24.pdf
1009c488f8b3c8d5885965f6a000fabb2dbb91e05b2c3d260de38a2f6cc7d7c2Indexed text
Scope of Services | Page 6 FEE SCHEDULE – Surveying & Design Our fee for the services outlined above is as follows: Item No. Description Lump Sum Fee Task I Topographic and Existing Condition Surveying Services $18,800.00 Task II Civil Engineering Services $24,100.00 TOTAL: $42,900.00 FEE SCHEDULE – Construction Inspection & Certification of Completion The time required to perform construction inspection services is a function of established contract duration(s), contractor’s schedule, and the Township’s need for part-time or full-time inspection. We will provide construction inspection services to fit with the Township’s needs. The services will be provided on an hourly basis. Our fee for the above referenced services is as follows: Construction Administration/Construction Inspection Services $105.00/hr. Construction Inspection Overtime Rate $157.50/hr.
Scope of Services | Page 7 HOURLY BILLING RATES As submitted in our Qualification package to the Township of West Orange on November 15, 2022, following are our municipal billing rates: PROFESSIONAL ENGINEER $ 180.00 SENIOR PROJECT MANAGER, ENGINEERING $ 160.00 SENIOR PROJECT MANAGER, LANDSCAPE ARCHITECTURE $ 150.00 SENIOR DESIGNER $ 125.00 DESIGNER $ 95.00 INSPECTOR $ 105.00 ENGINEERING TECHNICIAN $ 85.00 PROFESSIONAL LAND SURVEYOR $ 170.00 SENIOR PROJECT MANAGER, SURVEYING $ 150.00 PROJECT SURVEYOR $ 135.00 SURVEYING TECHNICIAN $ 105.00 PARTY CHIEF $ 110.00 INSTRUMENT PERSON $ 95.00 ADMINISTRATIVE SUPPORT $ 75.00
Personnel Assignments | Page 5 SECTION 2 Personnel Assignments For this project, GPI will perform the work in its entirety. No sub-consultants will be needed. All work will be done entirely within GPI’s Engineering and Surveying Departments. Michael E. Pirog, PE, Project Manager, will be responsible for the overall design, contract adherence, and overall project supervision. Mr. Pirog is quite familiar with the Township of West Orange, having worked on several other Township projects in recent years. He will be assisted by Engineering Department staff members Michael A. Wallo, PE, CME, Assistant Director of Engineering/Project Engineer and Lenin Cruz, Senior Designer. Quality Assurance-Quality Control (QAQC) will be performed by Andrew Cangiano, PE, CME, Director of Engineering – Morris Plains Office.
Project Schedule | Page 6 SECTION 3 Project Schedule We are committed to adhering to the Township’s goal to advertise for bids by Winter 2024/2025, with a construction start in Summer/Fall 2025. We anticipate work will proceed within one (1) week after the award of contract. GPI has the resources to complete the project in a timely fashion, and we are confident that we can achieve the Township’s goal. We have assumed a March 1, 2024 Notice to Proceed award and have prepared the following Project Schedule: March 2024 April 2024 May 2024 June 2024 July 2024 August 2024 1 Surveying Services 2 Design of Preliminary Plans/Specs 3 Township Review and Comment 4 Final Plans and Specifications for NJDOT 5 NJDOT Review 6 Final Bid Documents March 1, 2024 (Assumed Award & NTP ) Project Schedule
Sample Insurance Certificate | Page 7 SECTION 4 Sample Insurance Certificate
File revisions (1)
- Sep 29, 2026
1009c488f8b31,190,498 bytes