Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Apr 24, 2024

138-24 Exhibit to Resolution Adopting the Township of West Orange Vision Zero Action Plan.pdf

Preserved file SHA-256f6a71245adb1a6c32d7a456d59b7e524262887c178a630b8b9517ea827494fde

Indexed text

Page 92

nA k Ter Colg ate ittle I nkli Par dle k ue id on M Wh Fra • 13% reduction in pedestrian/vehicle en Edis hool Av Sc Ri e dg crashes at intersections Ave lin Av ve W Llew eA t nk hS illi ellyn Aveu ve nd ng A ve Fra

Page 92

nd ng A ve Fra am son hla ne hA Hig St As chu Wat dis • 4-lane to 3-lane road diet conversion: an Wat Main Street 19-47% reduction in total crashes St ton hing Park Was ool S c h Wa sh ing ton • Sidewalks: 16-89% reduction in crashes involving St St Mou pedestrians walking along roadways de n Guild t Carme St ea Acad l bia M emy

Page 92

ea Acad l bia M emy lum d El m Wa Co St s hin • 15% reduction in total crashes Ch gto er n Str • Very low cost Ave ry ee St t ve sey e nA Av k Ter Colg ate ittle I nkli nd Par ve iddle k • Signalized Intersection to Roundabout: 78% hla hA PM Wh n Fra d is o ar E l reduction in fatal and injury crashes As h o o

Page 92

l reduction in fatal and injury crashes As h o o k dis ayRidg Sc W ve an Ave W e t Av hS nA illi St e am Park ng Hig so St chu Wat Wat ton et hing Was ool tre S c h in S Wa *Includes cost of roundabouts and cost of countermeasures that sh Ma ing ton overlap with intersecting corridors.

Page 92

ing ton overlap with intersecting corridors. Roundabouts are subject to St Par St k Ave additional feasibility and cost studies, and estimates do not account de St nu ea e for Right-of-Way acquisition. Estimated cost does not include bia M lighting improvements (additional studies are recommended). Cost lum estimates are primarily based on the NJDOT 2022 cost estimate Co guidelines for safe routes. https://www.saferoutesnj.org/wp-content/ uploads/2022/05/Design-Treatment-Estimating-Guidelines.pdf Estimated e ** Although not specifically a Proven Safety Countermeasure, traffic Av

Page 92

** Although not specifically a Proven Safety Countermeasure, traffic Av Construction Cost: nd signal timing update/optimization should be included as part of Road ve hla hA Diet/Reconfiguration, Left- and Right-Turn Lanes, Leading Pedestrian As dis Intervals, and Protected-Only Left Turn Signal Phasing alternatives. an ~$3 Million* St Park WEST ORANGE TOWNSHIP: VISION ZERO ACTION PLAN 91

Page 93

HIN CORRIDOR FACT SHEETS CORRIDOR B: MT PLEASANT AVENUE Represents 1.6% of HIN miles COUNTY ROUTE 660 SPEED KEY CRASH FACTS 0.6 MILES LIMIT 40-50' WIDTH / 2 - 4 LANES # % 275 Crashes 3.2% of all West Orange Crashes SHOULDERS VARY PARKING PERMITTED AT SHOULDERS 40 15 Fatal, Severe 3.3% of all Fatal, Severe & Minor Injury & Minor Injury Crashes HIN SCORE EQUITY + HIN SCORE 3 Pedestrian Crashes 3.5% of all Pedestrian Crashes 25 39 4 Bicyclist Crashes 13% of all Bicyclist Trefoil PassCrashes OVERREPRESENTED CRASH TYPES I ve Bnd y

Page 93

ve Bnd y Pa Edgehill A Wa rk Oak Tu est W l ip ay For Av TOP CRASH FACTORS e Wild Pa INTERSECTION CRASHES woo rk A d Av ve 144 Crashes e Brook Way 7% of all Intersection Crashes Bro oks

Page 93

Brook Way 7% of all Intersection Crashes Bro oks In Elm ide te Gu Mount Carmel St rs ild Academy Whittlesey Ave Rd ta Fairway Dr Ash ley R te Che I Main St Franklin Ave rry d 28 St ld W a y 0 mfie Watchung Ave Colgate Park

Page 93

Watchung Ave Colgate Park Bloo le Watson Ave High St M idd n l iso oo Ridg Park Ter Ed Sch Wi e Ave ll Rd iam Dr St Greentree ood Gaston n gto Condit Ter hin ol Glen

File revisions (1)