an Datum 1983 (New Jersey State Plane Coordinate SystemNAD 83) and North American Vertical Datum 1988 (NAVD 88); C. Benchmark(s) to be set on site for future use; D. Existing Conditions/Survey Control plan; E. Coordinate utility mark-outs; As part of the deliverables, an electronic AutoCAD file of the Boundary and Topographic Survey will be provided to the Township. 2. CIVIL ENGINEERING SERVICES A. B. Proposed roadway profiles matching existing grades; Roadway improvements include curb, sidewalk, aprons, pavement milling and resurfacing, pavement striping, new traffic signs, shade trees; Section I | Page 1
MA 2025 NJDOT Aid Program C. D. E. F. G. H. I. J. K. Curb ramp plans and details as necessary; New drainage improvements as necessary; Drainage structure repairs with new frames, grates, curb pieces as necessary; New manhole castings, frames and covers as necessary. Repair existing manholes as necessary; Coordinate with WO Traffic Bureau for the preparation of traffic control and detour plans; Prepare construction details; Plan Set to include but not limited to Cover Sheet, Existing Conditions/Survey Control Plan, Demolition Plan, Construction Plan, Grading and Utility Plan, Soil Erosion and Sediment Control Plan and Details, Traffic Control and Detour Plans, and Construction Details; Include one (1) meeting with Township Officials for Preliminary Design; Bid Package that includes bid set of plans and construction specifications in accordance with public bidding laws; Bidding documents (plans and specifications) are to be part of the deliverables to the Township via AutoCAD, hard copy and PDF files. The total length of each road is approximately: Helen Avenue Lawrence Avenue Florence Place Lowell Avenue 635 linear feet 719 linear feet 722 linear feet 1,505 linear feet The total length of roads is approximately 3,581 LF. SCOPE OF WORK I. Topographic and Existing Condition Surveying Services A boundary survey is not included in the scope of services. Right-of-way will be shown from Township Tax Map and County GIS information. A. We will conduct a field survey for Helen Avenue, Lawrence Avenue, Florence Place, and Lowell Avenue within the project scope and all adjacent intersections. The project length for all four (4) roads is approximately 3,581 linear feet. The survey will include the following: ▪ Establishing of elevation benchmarks outside of the anticipated area of construction. Benchmarks will be placed at the beginning and end of project limit, and at least two in the construction limits. Vertical control will be based on NAVD 1988. Detailed descriptions of the elevation benchmarks shall be shown on the Plan Sheets. ▪ Location of all topographic features within the existing right-of-way and fifty (50) feet up any intersecting streets. These features will include buildings, curbs, sidewalks, driveways, depressed curbs, driveway aprons, sidewalk depressed curbs, steps, walls, pillars, fences, guide rail, trees greater than 4” Section I | Page
ures will include buildings, curbs, sidewalks, driveways, depressed curbs, driveway aprons, sidewalk depressed curbs, steps, walls, pillars, fences, guide rail, trees greater than 4” Section I | Page 2
MA 2025 NJDOT Aid Program diameter within the right-of-way (with diameters), shrubs, flag poles, lamp posts, sign posts, mailboxes, drainage swales and traffic signals and related equipment enclosures. II. ▪ Locate all utilities by above ground observation and utility mark-outs. The horizontal locations and elevations of the sanitary sewer storm drainage features will be measured. The pipe material, invert elevations and pipe diameters will be measured only as needed for drainage improvements. ▪ Property lines and right-of-way will be depicted based on the municipal tax map and County GIS information. B. Topographic base mapping of the project area will be prepared at a horizontal scale of 1"=20', using AutoCAD format. The plans will show the Tax Map right-of-way and all information located on the survey. Centerline profile will be provided at a horizontal scale of 1" = 20' and vertical scale of 1" = 2'. Cross-sections will be provided at a horizontal scale of 1" = 5' and vertical scale of 1"= 2'. C. Base map plans will be provided to the Township on printed sheets and digitally, in the format requested by the Township. D. All surveying and design information will be provided in standard engineering units (feet/10ths/100ths) or (feet/inches). Civil Engineering Services A. Before commencing the design, we will meet with you to review the specific requirements, including reviewing each street in the field. We will coordinate our efforts with your department throughout the project. B. We will prepare engineering plans for each street at an anticipated scale of 1” = 20’ utilizing the base mapping prepared above. C. Proposed roadway profiles will match existing grades. D. Curb ramp design will detail the construction of ADA compliant curb ramps utilizing NJDOT curb ramp standards and details. Curb will be granite 6” face, concrete curbs at ADA ramps. E. Design new granite curb for areas where required on all roads, milling of existing pavement and construction of new 2” surface course with full depth asphalt pavement where required, replacement sidewalk and driveway aprons as required, new striping and new traffic signage and shade trees as directed by the Township. F. We assume design of minor drainage improvements as necessary. Should substantial drainage upgrades be required, this proposal will be amended. G. New manhole castings as
rected by the Township. F. We assume design of minor drainage improvements as necessary. Should substantial drainage upgrades be required, this proposal will be amended. G. New manhole castings as necessary, repair manholes as required and new catch basin frames, grates, curb piece, rebuild inlets as required. H. We will coordinate with West Orange Traffic Bureau and will prepare detour plans each roadway closure, as needed. Detour plans will depict detour routes with signage on to local and or County roadways as required for the roadway milling and resurfacing operations. I. All design criteria will comply with the current NJDOT and MUTCD specifications. Section I | Page 3
MA 2025 NJDOT Aid Program J. We will prepare a complete set of specifications. K. A final Engineer’s Estimate of Construction will also be prepared. L. All plans and specifications will be in accordance with New Jersey Department of Transportation Standard Specifications, and we will submit them for review by the NJDOT Local Aid Office. M. We will prepare and submit twenty (20) sets of Contract Documents. ASSUMPTIONS 1. Full project length will be mill and overlay. No change to existing profile or cross-slopes. 2. Partial or full curb and sidewalk replacement assumed for all roads. 3. Proposed sidewalk where there is no existing sidewalk is excluded from this proposal. 4. ADA curb ramp reconstruction as required. 5. Drainage improvements as required. 6. GPI assumes all railing, guide rails, steps, retaining wall or landscape walls will remain as-is. Replacement of these features is not anticipated and is excluded from this proposal. Section I | Page 4
MA 2025 NJDOT Aid Program Section II: Fee Schedule Surveying & Design Our fee for the services outlined above is as follows: Item No. Description Lump Sum Fee Task I Topographic and Existing Condition Surveying Services $10,710.00 Task II Civil Engineering Services $15,905.00 TOTAL: $26,615.00 Construction Inspection & Certification of Completion The time required to perform construction inspection services is a function of the established contract duration(s), the contractor’s schedule, and the Township’s need for part-time or full-time inspection. We will provide construction inspection services on an hourly basis to fit the Township’s needs. Our fee for the above-referenced services is as follows: Construction Administration/Construction Inspection Services Construction Inspection Overtime Rate $105.00/hr. $157.50/hr. HOURLY BILLING RATES As submitted in our Qualification package to the Township of West Orange on November 28, 2023, the following are our municipal billing rates for 2024: PROFESSIONAL ENGINEER SENIOR PROJECT MANAGER, ENGINEERING SENIOR PROJECT MANAGER, LANDSCAPE ARCHITECTURE SENIOR DESIGNER DESIGNER INSPECTOR INSPECTOR OVERTIME RATE ENGINEERING TECHNICIAN $ $ $ $ $ $ $ $ 180.00 160.00 150.00 125.00 95.00 105.00 157.50 85.00 PROFESSIONAL LAND SURVEYOR SENIOR PROJECT MANAGER, SURVEYING PROJECT SURVEYOR SURVEYING TECHNICIAN PARTY CHIEF INSTRUMENT PERSON ADMINISTRATIVE SUPPORT $ $ $ $ $ $ $ 170.00 150.00 135.00 105.00 110.00 95.00 75.00 Section II | Page 5
MA 2025 NJDOT Aid Program Section III: Personnel Assignments For this project, GPI will perform the work in its entirety. No sub-consultants will be needed. All work will be done entirely within GPI’s Engineering and Surveying Departments. Michael E. Pirog, PE, CME, Project Manager, will be responsible for the overall design, contract adherence, and overall project supervision. Mr. Pirog is quite familiar with the Township of West Orange, having worked on several other Township projects in recent years. He will be assisted by Engineering Department staff members Michael A. Wallo, PE, CME, Assistant Director of Engineering/Project Engineer and Ryan Mangano, Senior Designer. Quality Assurance-Quality Control (QAQC) will be performed by Andrew Cangiano, PE, CME, Director of Engineering – Morris Plains Office. Section III | Page 6
MA 2025 NJDOT Aid Program Section IV. Project Schedule We are committed to adhering to the Township’s goal of advertising for bids by Spring 2026 and starting construction in Summer/Fall 2026. We anticipate work will proceed within eight (8) months after the contract is awarded. GPI has the resources to complete the project promptly, and we are confident that we can achieve the Township’s goal. March 2026 February 2025 January 2026 December 2025 November 2025 October 2025 September 2025 August 2025 December 16, 2024 (Assumed Award & NTP ) We have assumed a December 16, 2024 Notice to Proceed award and have prepared the following Project Schedule: 1 Surveying Services 2 Design of Preliminary Plans/Specs 3 Township Review and Comment 4 Final Plans and Specifications for NJDOT 5 NJDOT Review 6 Final Bid Documents Section IV | Page 7
MA 2025 NJDOT Aid Program Section V. Sample Insurance Certificate Section V | Page 8