Supporting Documentation · May 20, 2025
147-25 Proposals Recieved.pdf
1d2c38bd8e46b84b2b3283bb618caaf746aff8c5f481fbfeda0bb8e1b36a0888Indexed text · page 2
Show all pages2. Civil Engineering Services: A. Develop three (3) color renderings; B. Stormwater management and site drainage improvements for a minor development (400 SF or greater of new impervious) as necessary; C. Design for new community garden including considerations for water at various locations; D. Design considerations for the feasibility of a walkway between the garden and exercise equipment that is ADA compliant; E. Prepare construction details for the community garden and exercise area; F. Plan Set to include but not limited to Cover Sheet, Existing Conditions/Survey Control Plan, Demolition Plan, Construction Plan, Grading and Utility Plan, Soil Erosion and Sediment Control Plan and Details, and Construction Details; G. Township intends to improve the community garden by utilizing NJDEP Permit by Rule(s) to expedite the design and permitting process. Permitting coordination with State, Local and Municipal agencies as required for all proposed site improvements; H. Include four (4) meetings with the Township Officials for Kickoff, Preliminary Design, Public Presentation and Final Design; I. Bid Package that includes bid set of plans and construction specifications in accordance with public bidding laws; J. Bidding documents (plans and specifications) are to be part of the deliverables to the Township via AutoCAD, hard copy, and PDF files. 3. Construction Administration Services: Provide separate lump sum cost for construction administration services based on full-time inspection. Tax map with Park site delineated, Boundary and Topographic Survey and Exhibit showing project area and proposed improvements is enclosed. The cost of services shall be for a complete design and bid package including cost estimates, plans, specifications and bid documents (twenty copies) for bidding purposes including detour plans. All plan specifications and bid documents shall be in conformance with the latest New Jersey Department of Transportation specifications. Proposals shall be on a lump sum basis. Hourly rates shall be submitted with all proposals for any additional work. It is the intent of this office to advertise for bids by Spring 2026 with construction in Summer and Fall 2026. Proposals shall be submitted in writing via email on or before 10:00 A.M. Monday, May 12, 2025 and shall include a specified completion date or number of days required for completion of the work
2026. Proposals shall be submitted in writing via email on or before 10:00 A.M. Monday, May 12, 2025 and shall include a specified completion date or number of days required for completion of the work after approval is granted to proceed. Also, evidence of proper insurance shall be submitted for approval by the Township Attorney. AN EQUAL OPPORTUNITY EMPLOYER www.westorange.org
File revisions (1)
- Sep 29, 2026
1d2c38bd8e4616,558,460 bytes