Supporting Documentation · May 20, 2025
147-25 Proposals Recieved.pdf
1d2c38bd8e46b84b2b3283bb618caaf746aff8c5f481fbfeda0bb8e1b36a0888Indexed text · page 64
Show all pagesTownship of West Orange Estimate of Fees for Professional Engineering Services Re: Degnan Park Community Garden and Exercise Equipment E. May 12, 2025 Our File No. 2025-200 Page 2 Coordinate utility mark-outs. As part of the deliverables, an electronic AutoCAD file of the Boundary and Topographic Survey prepared by Neglia should be provided if available. 2. Civil Engineering Services The work under this phase will include the following services: A. Develop three (3) color renderings for review with the Township; B. Prepare Stormwater management and site drainage improvements for a minor development (400 SF or greater of new impervious) as necessary; C. Design the new community garden including considerations for water at three (3) locations; D. Design considerations for the feasibility of a walkway between the garden and exercise equipment that is ADA compliant; E. Prepare construction details for the community garden and exercise area; F. Prepare construction details; G. Prepare a Plan Set to include but not limited to Cover Sheet, Existing Conditions/Survey Control Plan, Demolition Plan, Construction Plan, Grading and Utility Plan, Soil Erosion and Sediment Control Plan and Details, and Construction Details; H. Notify the NJDEP as may be necessary for FHA Permit by Rule; I. Obtain a certification from the Hudson, Essex, Passaic Soil Conservation District if the disturbance exceeds 5,000 square feet; J. Coordinate with the local water company for the extension of new water services; K. Attend four (4) meetings with the Township Officials including Kickoff, Preliminary Design, Public Presentation and Final Design; L. Prepare a Bid Package that includes bid plans and construction specifications in accordance with public bidding laws; and, M. Provide Bidding documents (plans and specifications) to the Township via AutoCAD, hard copy and PDF files. S:\West Orange\Proposals\25-05-12 Degnan Community Garden.docx
File revisions (1)
- Sep 29, 2026
1d2c38bd8e4616,558,460 bytes