Supporting Documentation · May 20, 2025
147-25 Proposals Recieved.pdf
1d2c38bd8e46b84b2b3283bb618caaf746aff8c5f481fbfeda0bb8e1b36a0888Indexed text · page 65
Show all pagesTownship of West Orange Estimate of Fees for Professional Engineering Services Re: Degnan Park Community Garden and Exercise Equipment May 12, 2025 Our File No. 2025-200 Page 3 Fee Estimate We will provide the necessary engineering services as described above based upon the cost breakdown as noted below: A. Land Surveying Services ............................................... $18,000.00 B. Civil Engineering Services ............................................. $26,000.00 Total Lump Sum Fee for Services ......................................... $44,000.00 3. Construction Administration Services (Separate Fee) The following services will be provided under this phase: A. Contract preparation including review of bonds, insurance certificates and project manning reports; B. Attend preconstruction meeting; C. Provide assistance with interpretation of contract documents; D. Review shop drawings for site-related items; and, E. Provide construction observation services, prepare contractor punch lists and review and prepare pay estimates. F. Perform project close out and final pay estimate/close out change order. The Lump Sum fee for Construction Administration Services is $20,000.00. Exceptions: NJDEP permitting with the exception of the FHA Permit By Rule. Additional NJDEP permitting is outside of the scope of this proposal. Any work not specified as listed in the above phases shall be considered additional services and will be invoiced at the time said work is authorized by the Township. Application fees are considered extra and will be requested at time of submission. S:\West Orange\Proposals\25-05-12 Degnan Community Garden.docx
File revisions (1)
- Sep 29, 2026
1d2c38bd8e4616,558,460 bytes