Supporting Documentation · May 20, 2025
147-25 Proposals Recieved.pdf
1d2c38bd8e46b84b2b3283bb618caaf746aff8c5f481fbfeda0bb8e1b36a0888Indexed text · page 70
Show all pagesZayibeth Carballo, P.E. Township of West Orange May 12, 2025 Page 4 of 4 ▪ ▪ ▪ ▪ ▪ ▪ Preparation of formal applications or permits with the NJDEP. Environmental testing or investigations. Soil testing, borings, or similar site investigations. Architectural, structural, or building design services. Preparation of an as-built survey following completion. Application and permit fees shall be paid directly by the Township. The scope, price, and other contents offered in this proposal are conditional upon your acceptance of the attached H2M Standard Terms & Conditions (Ver 210520). Please indicate your acceptance by signing and dating the attached document where indicated and returning it to our office as your authorization to proceed, or provide other acceptable form of authorization. H2M appreciates the opportunity to present this proposal to the Township. Please advise us if you need additional information or require clarification of this Proposal. Very truly yours, H2M Associates, Inc. Richard B. Schommer, Jr., PE, PP Charles A. Martello, PE, LSRP Department Manager | Civil Engineering Executive Vice President Enclosures
File revisions (1)
- Sep 29, 2026
1d2c38bd8e4616,558,460 bytes