Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 12, 2025

253-25 Resolution 122-24_PO- GPI Phase 2.pdf

Preserved file SHA-25668ffaf3e62c5cc23b5476deea04171325a864b41781d6f14af54cb9b3c97b4db

Indexed text · page 5

Show all pages
Page 5

within a $0-foot (+/-) right-of-way. Proposals shall be submitted to provide all work required to ptovide a complete design package as generally described onthe enclosed desetiption. The cost of services shall be a complete design and bid package including cost estimates, plans and specifications (twenty copies each} for bidding purposes, detour plans, construction stakeout and cut sheets. This project will be fully funded by - Township of. West Orange. “All plans, specifications and bid documents shall be in conformance with the’ {atest New Jersey Department of ‘Transportation specifications, and, shall be submitted to our office for review prior to finalizing contract documents. Proposals shall be on‘a’ umd sum, basis. Hourly sates shall be submitted with ali proposal for any additional work. Design will consist of utilizing aetial orthophoto maps for preparation of project base maps, A. one+site ‘visit will be conducted to verify and supplement planimetric elements such as roads, inlets, and other -features for the preparation of plans and specification for the milling and resurfacing of the roadways, It is the intent of this office to advertise for bids upon availability of funds from the Township in Winter/Spring 2025. Proposals shall be submitted in writing on or before 10:00 A.M. Thursday, March 28, 2024 to the Department of Engineering, 25 Lakeside Avenue, West Orange, New. Jersey 07052 and shall include a specified completion date or number of days required for completion of the work after approval is granted to ‘proceed. Also, evidenve of proper insuéance shall be submitted by the Township Attorney. A separale proposal for construction inspection and cectification of completion should. also be included if available from your firm. Very truly yours, Zayibeth Carballo Director/Municipal Engincer “2Clei Ene, AN EQUAL OPPORTUNITY EMPLOYER www. westorange.org i i i i i i

File revisions (1)