Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jan 6, 2026

7-26 - RFP RFI Consultant Response.pdf

Preserved file SHA-25666d2eaa18850e14491965f6ad6c0c07d8cf458ad70e5c9a423646058c9734a7f

Indexed text · page 33

Show all pages
Page 33

BOSWELL Fort Lee Main Street Streetscape Borough of Fort Lee, New Jersey (Bergen County) Main Street Streetsca: Borough of Fort Lee, New] CLIENT The Borough of Fort Lee engaged Boswell to provide Design, Permitting, and Borough of Fort Lee Construction Management and Inspection services to the Main Street Streetscape project. 309 Main Street This project is located in the Borough's central business district, along Main Street from Fort Lee, NJ 07024 the intersection of Lemoine Avenue to Center Avenue ~ a distance of approximately 1.25 miles. The scope of the $9 million project included concrete curbing, patterned concrete / CONTACT brick pavers sidewalk, installation of decorative street lighting with new conduits and Alfred Restaino wiring, and installation of decorative street signage and sign posts. Endurablend high Administrator friction surface treatments were applied in 19 crosswalk locations. The project also 201.592.3500 consisted of the reconstruction and improvement of the existing drainage system, installation of a 5,000 LF 10-inch ductile iron pipe sanitary force main, new traffic signals, ae cOosT asphalt milling and paving, and tree planting and landscaping. 9 million COMPLETION DATE 2022 DISCIPLINES INCLUDED Design Permitting Construction Management Construction Inspection

File revisions (1)