Supporting Documentation · Jan 6, 2026
7-26 - RFP RFI Consultant Response.pdf
66d2eaa18850e14491965f6ad6c0c07d8cf458ad70e5c9a423646058c9734a7fIndexed text · page 42
Show all pagesFrank M. Krupinski, PLS locations (both as-built and mark-out), as well as other pre-construction and post construction topographic surveys. e Bergen County Department of Planning and Economic Development, Camp Tamarack, Oakland, NJ. Performed record research and boundary analysis for this 181-acre tract. Prepared a Perimeter Survey and a later Boundary Survey for Green Acres acquisition. e NJ Department of Human Services/NJ Division of Property Management & Construction, Greystone Park Psychiatric Hospital, Morris County, NJ. Prepared boundary surveys and metes & bounds descriptions for three parcels totaling 199 acres to be conveyed to the County of Morris. °- New Jersey Department of Transportation (NJDOT), U.S. Route 30 (White Horse Pike) & Evesham Avenue Intersection Improvements, Magnolia, NJ. Responsible for planning and processing of the master control survey, which was performed utilizing GNSS. The GNSS system was also used for establishing horizontal and vertical control for the aerial mapping. Responsible for input and adjustment of survey baselines, downloading and processing of field survey data, and supervising right-of-way document preparation. ° Valley Court and Gail Place Floodwall, Secaucus, N.J. Supervised field survey and drafting, downloaded and processed all survey data, including aerial mapping photo control, performed record research and boundary analysis for this over 37-acre boundary and topographic survey for the Town of Secaucus. This boundary survey required the establishment of boundary lines for 80 properties, calculation of mean high water and researching existing tidelands conveyances. e East Orange Water Commission, Millburn, NL Performed record research, field survey and boundary analysis for this ancient property which consisted of over 255 acres. A closed survey baseline loop of three and three quarters (3.75) miles was run and wetlands flagging was located throughout this heavily wooded and mainly undeveloped property. Record deeds for the property dated back to the early 1900s and the latest road mapping for a portion of the property dated back to 1916. e Trust For Public Land, Dundee Island Park, Passaic, N.J Supervised field survey and drafting, downloaded and processed all survey data, performed record research, including tidelands conveyances, and boundary analysis for this over 7-acre boundary and
N.J Supervised field survey and drafting, downloaded and processed all survey data, performed record research, including tidelands conveyances, and boundary analysis for this over 7-acre boundary and topographic survey. This complex boundary survey required reestablishing a railroad centerline from ties referenced in an 1882 deed and the mean high-water line of a branch of the Passaic River no longer in existence. e Passaic Valley Sewerage Commission, Newark Bay Treatment Plant, Newark, N. Performed record research, boundary analysis for the determination of the boundary for the four (4) tracts, containing 142 acres total, that comprise this complex, as well as CAD drafting. ° Bergen County Health Care Center, Rockleigh, NJ. Responsible for the determination of the boundary on this over 50-acre tract. Since the deed of record did not close by 50 feet, it was imperative that all available mapping and adjoining property deeds be thoroughly researched. More than 20 maps were assembled from the County Clerk's Office, County Engineer's Office, the Borough of Rockleigh and other surveyors to aide in the resolution and establishment of the boundary. ° Hackensack University Medical Center, Pascack Valley Hospital, Westwood, NJ. Prepared an ALTA/ACSM Land Title Survey for this 22-acre property. Was responsible for record research, boundary analysis, preparation of metes & bounds and CAD drafting. ° ALTA/ACSM Land Title Survey, Piscataway, NJ. Performed record research and boundary analysis, and supervised field survey and mapping for the 115-acre Ericsson facility. ° Sourland Mountain Natural Area, West Amwell, NJ. Performed record research, boundary analysis, mapping and preparation of deliverables for the partial Green Acres acquisition of this 56-acre property. e NJDOT, Route 80, Section 20 Roadway Widening (Metric), Hackensack, South Hackensack & Teterboro, NJ. Responsibilities included planned and executed the master control survey, which was performed utilizing GNSS The GNSS system was also used for establishing horizontal and vertical control for the aerial mapping. Responsible for the downloading and processing of all data.
File revisions (1)
- Sep 29, 2026
66d2eaa1885017,247,724 bytes